Dynamic inversion method for the material parameters of a high arch dam and its foundation

被引:38
|
作者
Li, Huokun [1 ]
Wang, Gang [1 ]
Wei, Bowen [1 ]
Zhong, Yiwei [1 ]
Zhan, Lianghong [1 ]
机构
[1] Nanchang Univ, Sch Civil Engn & Architecture, Nanchang 330031, Jiangxi, Peoples R China
基金
中国国家自然科学基金;
关键词
High arch dam; Parameter inversion; Response surface theory; Modal identification; Prototype vibration test; RESPONSE-SURFACE; BACK-ANALYSIS; STRUCTURAL DAMAGE; RELIABILITY; MODEL;
D O I
10.1016/j.apm.2019.02.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The overall mechanical behavior of the structure of an arch dam is comprehensively reflected by the vibration modal information included in measured vibration response. Hence, the results obtained from inverting material parameters based on measured vibration data are often superior to those based on static monitoring data. In this study, a dynamic inversion method for the material parameters of a high arch dam and its foundation is proposed on the basis of the measured vibration response. First, an arch dam prototype test is conducted to obtain the measured dynamic displacement response as input. Then, a stochastic subspace identification method based on singular entropy is formulated to determine the modal parameters. Second, a dynamic elastic modulus (DEM) with a great influence on the modal parameters is selected as the material parameter to be inverted. Then, a response surface model (RSM), which reflects the nonlinear relationship between the material and modal parameters of each zone, is constructed. Latin hypercube sampling is used to generate the sample library of the DEM. The RSM is fitted by modal parameters calculated on the basis of the arch dam finite element model (FEM) and is applied to replace the FEM. Finally, the optimization mathematical model of the inversion of the DEM is established. Then, the objective function is optimized through a genetic algorithm, and the optimal combination of the DEM in each zone is inverted. The modal parameters of the arch dam calculated by inversion results are consistent with those measured by variation law and values. Therefore, the inversion results are reasonable and reliable. This method provides a new idea for determining the material parameters of a high arch dam and its foundation during the operation period. (C) 2019 Elsevier Inc. All rights reserved.
引用
收藏
页码:60 / 76
页数:17
相关论文
共 50 条
  • [21] New design method of RCC high arch dam
    Chen, QH
    ROLLER COMPACTED CONCRETE DAMS, 2003, : 427 - 430
  • [22] Dynamic behaviour of an arch dam-foundation-reservoir system: Experimental and numerical study
    Camara, RC
    Oliveira, SB
    STRUCTURAL DYNAMICS, VOLS. 1 & 2, 1996, : 703 - 709
  • [23] Feasibility of columnar jointed basalt used for high-arch dam foundation
    Wei, Yunjie
    Xu, Mo
    Wang, Wenpei
    Shi, Anchi
    Tang, Mingfa
    Ye, Zhiping
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2011, 3 : 461 - 468
  • [24] Long-term deformation influence of slope and foundation to high arch dam
    Yang, Q.
    Pan, Y. W.
    Liu, Y. R.
    Chang, Q.
    Cheng, L.
    COMPUTER METHODS AND RECENT ADVANCES IN GEOMECHANICS, 2015, : 1919 - 1924
  • [25] Dynamic analysis and research on abutment stability of high arch dam
    College of Civil Engineering, Chongqing University, Chongqing 400044, China
    不详
    不详
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (3421-3426):
  • [26] FOUNDATION ANALYSIS OF AN ARCH DAM - COMPARISON OF 2 MODELING TECHNIQUES - NO TENSION AND JOINTED ROCK MATERIAL
    ALONSO, EE
    CAROL, I
    ROCK MECHANICS AND ROCK ENGINEERING, 1985, 18 (03) : 149 - 182
  • [27] Development and Application of Dynamic Integrated DIC Material Parameters Inversion Method for SHPB Tests
    Cai, S.
    Zhao, J.
    Liu, Z.
    Fu, Y.
    EXPERIMENTAL MECHANICS, 2024, 64 (07) : 995 - 1003
  • [28] Study on the dynamic interaction between an arch dam and its appurtenant structures
    Yuan, Jie
    Wang, Jin-Ting
    Wang, Dong
    Mao, Yong-Zheng
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2021, 144
  • [29] A novel scaled boundary finite element method for dynamic impedance of an arch dam foundation in a complex layered half-space
    Li, Zhi-yuan
    Hu, Zhi-qiang
    Hong, Zhong
    Lin, Gao
    ENGINEERING ANALYSIS WITH BOUNDARY ELEMENTS, 2022, 134 : 184 - 198
  • [30] Influence of the dynamic interaction between high rockfill dam and foundation
    Kong X.
    Zhou C.
    Zou D.
    Yu X.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2019, 50 (12): : 1417 - 1432