FOUNDATION ANALYSIS OF AN ARCH DAM - COMPARISON OF 2 MODELING TECHNIQUES - NO TENSION AND JOINTED ROCK MATERIAL

被引:5
|
作者
ALONSO, EE
CAROL, I
机构
关键词
D O I
10.1007/BF01112505
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
引用
收藏
页码:149 / 182
页数:34
相关论文
共 50 条
  • [1] Experimental study of an arch dam on a jointed foundation
    Lemos, JV
    Pina, CAB
    Costa, CP
    Gomes, JP
    EIGHTH INTERNATIONAL CONGRESS ON ROCK MECHANICS, VOL 3, PROCEEDINGS, 1997, : 1263 - 1266
  • [2] Three Dimensional Stability Analysis of Jointed Abutment Rock Mass of High Arch Dam
    Song Zhanping
    Chen Feixiong
    2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
  • [3] Earthquake analysis of arch dam including dam-foundation rock nonlinear dynamic interaction
    Du, XL
    Zhang, BY
    Tu, J
    Zhang, YH
    ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 571 - 578
  • [4] Deformation modulus of rock foundation in Deriner Arch Dam
    Yilmaz, Davut
    Altunisik, Ahmet C.
    Adanur, Suleyman
    GEOMECHANICS AND ENGINEERING, 2021, 26 (01) : 63 - 75
  • [5] Block theory techniques used in arch dam foundation stability analysis
    U.S. Department of the Interior, Bureau of Reclamation, Denver
    CO
    80225, United States
    Int. J. Rock Mech. Min. Sci., 3-4 (163.e1-163.e19):
  • [6] Investigation of damping in arch dam-water-foundation rock system of Mauvoisin arch dam
    Wang, Jin-Ting
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2011, 31 (01) : 33 - 44
  • [7] Seismic response analysis of arch dam-water-rock foundation systems
    杜修力
    王进廷
    Earthquake Engineering and Engineering Vibration, 2004, 3 (02) : 283 - 291
  • [8] Seismic response analysis of arch dam-water-rock foundation systems
    Du Xiuli
    Wang Jinting
    Earthquake Engineering and Engineering Vibration, 2004, 3 (2) : 283 - 291
  • [9] Feasibility of columnar jointed basalt used for high-arch dam foundation
    Wei, Yunjie
    Xu, Mo
    Wang, Wenpei
    Shi, Anchi
    Tang, Mingfa
    Ye, Zhiping
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2011, 3 : 461 - 468