Estimating manufacturing cycle time and throughput in flow shops with process drift and inspection

被引:9
|
作者
Chincholkar, Mandar [1 ]
Herrmann, Jeffrey W. [2 ]
机构
[1] Intel Corp, Hillsboro, OR USA
[2] Univ Maryland, College Pk, MD 20742 USA
基金
美国国家科学基金会;
关键词
Design for Production; Cycle time; Design; Process drift;
D O I
10.1080/00207540701513893
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Process drift is a common occurrence in many manufacturing processes where machines become dirty (leading to more contamination) or processing parameters degrade, negatively affecting system performance. Statistical process control tracks process quality to determine when the process has gone out of control (has drifted beyond its specifications). This paper considers the case where parts examined at a downstream inspection station are used to determine when the upstream process is out of control. The manufacturing cycle time from the out of control process to the downstream inspection process influences the detection time that elapses until the out of control process is noticed and repaired. Because an out of control process produces more bad parts, the detection time affects the number of good parts produced and the throughput of the manufacturing system. This situation is common in many industries but no models of the phenomena exist. This paper presents a novel manufacturing system model based on queueing network approximations for estimating the manufacturing cycle time and throughput of such systems. These are important performance measures since they influence economic measures such as inventory costs and revenue. The model can be used for a variety of system design and analysis tasks. In particular, the model can be used to evaluate the placement of inspection stations in a process flow.
引用
收藏
页码:7057 / 7072
页数:16
相关论文
共 47 条
  • [43] Label-free cell-cycle analysis by high-throughput quantitative phase time-stretch imaging flow cytometry
    Mok, Aaron T. Y.
    Lee, Kelvin C. M.
    Wong, Kenneth K. Y.
    Tsia, Kevin K.
    HIGH-SPEED BIOMEDICAL IMAGING AND SPECTROSCOPY III: TOWARD BIG DATA INSTRUMENTATION AND MANAGEMENT, 2018, 10505
  • [44] RESIDENT DRIVEN LEAN PROCESS IMPROVEMENT FOR PATIENT CYCLE TIME, IMPROVES CLINIC FLOW AND REDUCES PROVIDER BURNOUT.
    Lee, Moses
    Lee, Melissa S.
    Chang, Andrew A.
    Stevens, David
    JOURNAL OF GENERAL INTERNAL MEDICINE, 2017, 32 : S703 - S704
  • [45] Real-time capable modelling approach of an innovative flow forming process for the property-controlled manufacturing of graded parts
    Kersting, Lukas
    Arian, Bahman
    Rozo Vasquez, Julian
    Traechtler, Ansgar
    Homberg, Werner
    Walther, Frank
    AT-AUTOMATISIERUNGSTECHNIK, 2023, 71 (01) : 68 - 80
  • [46] The Integration of Group Technology and Simulation Optimization to Solve the Flow Shop with Highly Variable Cycle Time Process: A Surgery Scheduling Case Study
    Wang, T. K.
    Chan, F. T. S.
    Yang, T.
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [47] INOR 433-Advances in nanoparticle synthesis: Enhanced process control, real-time analysis, and high-throughput production using microscale flow reactors
    McKenzie, Lallie C.
    Jin, Hyungdae
    Hutanu, Daniela
    Chang, Chih-hung
    Remcho, Vincent T.
    Hutchison, James E.
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2008, 235