共 47 条
- [21] Comparing performance measures for the trade off of flow time and throughput in complex manufacturing systems LEAN BUSINESS SYSTEMS AND BEYOND, 2008, 257 : 143 - 150
- [23] Generating cycle time-throughput curves using effective process time based aggregate modeling 2008 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2008, : 127 - +
- [24] Study of the effect of process time variability on the production flow of a manufacturing system PROCEEDINGS OF THE SIMULATORS INTERNATIONAL XV, 1998, 30 (03): : 221 - 226
- [25] Bayesian estimation of defect inspection cycle time in TFT-LCD module assembly process IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1553 - 1558
- [28] A NOVEL METHOD TO REDUCE INSPECTION PROCESS CYCLE TIME WHILE USING A COORDINATE MEASUREMENT MACHINE PROCEEDINGS OF THE ASME 8TH ANNUAL DYNAMIC SYSTEMS AND CONTROL CONFERENCE, 2015, VOL 2, 2016,
- [29] Cycle Time Reduction for Coating Process in Manual Assembly Manufacturing Towards Economic Sustainability 6TH INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING 2019 (ICAME 2019), 2020, 834
- [30] Semiconductor business, process, product and fab influence on throughput, cycle time and chip cost. 1996 ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 96 PROCEEDINGS: THEME - INNOVATIVE APPROACHES TO GROWTH IN THE SEMICONDUCTOR INDUSTRY, 1996, : 119 - 139