Retractable tube design issues in ITER CXRS UPP #3

被引:0
|
作者
Baross, T. [1 ]
Biel, W. [2 ]
Krejczinger, A. [1 ]
Krasikov, Yu [2 ]
Panin, A. [2 ]
机构
[1] RMKI, WIGNER RCP, H-1521 Budapest, Hungary
[2] Forschungszentrum Julich, Assoc EURATOM FZJ, Inst Energieforsch Plasmaphys, D-52425 Julich, Germany
关键词
Retractable tube; Cooling loop; Tube support; Floating flange; Flexible ring;
D O I
10.1016/j.fusengdes.2013.02.105
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The retractable tube is located in the upper port plug #3 of ITER core charge exchange recombination spectroscopy (cCXRS), where it is surrounded by a set of mirrors, diagnostic shielding module (DSM), outer shell, cleaning device and shutter. Accordingly to the recent port plug concept the tube is an optional unit that carries the cleaning system of the first mirror. The cleaning device shall be a compact instrument at the tube head that influences the tube diameter primarily. Independently of the cleaning device the tube cooling channels and its proper support concept has to be developed. Various manufacturing methods are investigated for the proper layout of the tube cooling structure. They are the gun-drilled deep holes, the solid state bonded sheets forming cooling channels between the welded layers, 'tube-in-tube' approach. Most of them were analyzed in view of their thermal conditions. The tube support system design is a complex task, that has to take into account several boundary conditions and limitations. The tube must be compatible with the assumed ITER generic installation procedure, withstand the electromagnetic (EM) and thermal loads. Furthermore, the tube has to be exchanged several times during its lifetime. The paper summarizes the tube cooling layout possibilities and the assumptions on its support concepts. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:1352 / 1356
页数:5
相关论文
共 50 条
  • [21] Criteria and design trade-off issues for ITER
    Post, D.E.
    Uckan, N.A.
    Fusion Technology, 1992, 21 (3 pt 2A): : 1427 - 1433
  • [22] DESIGN STANDARD ISSUES FOR ITER IN-VESSEL COMPONENTS
    MAJUMDAR, S
    FUSION ENGINEERING AND DESIGN, 1995, 29 : 158 - 163
  • [23] CRITERIA AND DESIGN TRADE-OFF ISSUES FOR ITER
    POST, DE
    UCKAN, NA
    FUSION TECHNOLOGY, 1992, 21 (03): : 1427 - 1433
  • [24] Survey of the critical issues in the thermohydraulic design of the ITER divertor
    NET Team, Garching, Germany
    Heat Technol, 2 (27-34):
  • [25] DESIGN ISSUES OF THE PRE-COMPRESSION RINGS OF ITER
    Knaster, J.
    Baker, W.
    Bettinali, L.
    Jong, C.
    Mallick, K.
    Nardi, C.
    Rajainmaki, H.
    Rossi, P.
    Semeraro, L.
    ADVANCES IN CRYOGENIC ENGINEERING (MATERIALS), VOL 56: TRANSACTIONS OF THE INTERNATIONAL CRYOGENIC MATERIALS CONFERENCE - ICMC, 2010, 1219 : 145 - +
  • [26] Analysis of application and key design issues for natatorium architecture with retractable roof structure
    Zhang Z.
    Ge D.
    Zhou X.
    Gu F.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2020, 41 : 340 - 348
  • [27] Design and issues of the ITER in-vessel components ITER Joint Central Team and Home Teams
    ITER Joint Work Site, Garching, Germany
    Fusion Eng Des, Pt A (1-16):
  • [28] Design and issues of the ITER in-vessel components ITER joint central team and home teams
    Parker, RR
    FUSION ENGINEERING AND DESIGN, 1998, 39-40 : 1 - 16
  • [29] A full tungsten divertor for ITER: Physics issues and design status
    Pitts, R. A.
    Carpentier, S.
    Escourbiac, F.
    Hirai, T.
    Komarov, V.
    Lisgo, S.
    Kukushkin, A. S.
    Loarte, A.
    Merola, M.
    Naik, A. Sashala
    Mitteau, R.
    Sugihara, M.
    Bazylev, B.
    Stangeby, P. C.
    JOURNAL OF NUCLEAR MATERIALS, 2013, 438 : S48 - S56
  • [30] ITER DESIGN SPLIT 3 WAYS
    RODGERS, P
    PHYSICS WORLD, 1991, 4 (08) : 8 - 8