HORIZONTAL VIBRATION TESTING METHOD OF RAILWAY BRIDGE PILE FOUNDATION

被引:0
|
作者
Lu, Weinan [1 ]
Zhang, Hongru [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
关键词
bridge foundation pile; non-destructive testing; explicit dynamic finite element; vibration force; velocity response; bending stress wave;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Based on the explicit dynamic finite element model, dynamic responses of railway bridge pile foundation are simulated through pier-cap-pile-soil finite element model. The results show that: when the vibration force is applied at the bridge cap side surface, the bending waves of piles are produced, the horizontal velocity response at the pile head can display reflected stress wave from the pile bottom or fracture surface, and then we can determine whether the detected pile is complete or exist fracture damage. Compared with sonic echo method, this method avoids the multiple reflection of stress wave in the pile-cap interface effectively, and this test is more practical and more operable. This method should pay attention to the reasonable arrangement of the velocity sensors and try to shorten the vibration time, increase of the amplitude of force.
引用
收藏
页码:298 / 301
页数:4
相关论文
共 50 条
  • [21] Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation
    Leng Wu-ming
    Yang Qi
    Nie Ru-song
    Yue Jian
    ROCK AND SOIL MECHANICS, 2011, 32 (11) : 3341 - 3348
  • [22] CONSTRUCTION OF PILE FOUNDATION FOR RAILWAY VIADUCTS
    KHATTAR, MD
    PILING AND DEEP FOUNDATIONS, VOL 1, 1989, : 269 - 274
  • [23] Combined Calculating Method of Round Timber Pile Stacked on Horizontal Foundation
    Posypanov, S. V.
    LESNOY ZHURNAL-FORESTRY JOURNAL, 2011, (01) : 51 - +
  • [24] Parameter analysis of composite pile foundation in bridge foundation
    LI Guangxing 1
    2.Key Laboratory of Earth Information Detection Equipment
    Global Geology, 2012, 15 (01) : 42 - 47
  • [25] Seismic failure mechanism and fragility of pile foundation with elevated cap of railway bridge in permafrost region
    Zhang, Xiyin
    Yu, Shengsheng
    Wang, Wanping
    Zhang, Yibo
    Xu, Zhenjiang
    Huang, Anqi
    Sun, Binjie
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2022, 55 (07): : 77 - 89
  • [26] Long-term settlement prediction of high-speed railway bridge pile foundation
    杨奇
    冷伍明
    张升
    聂如松
    魏丽敏
    赵春彦
    刘维正
    Journal of Central South University, 2014, 21 (06) : 2415 - 2424
  • [27] Long-term settlement prediction of high-speed railway bridge pile foundation
    Yang Qi
    Leng Wu-ming
    Zhang Sheng
    Nie Ru-song
    Wei Li-min
    Zhao Chun-yan
    Liu Wei-zheng
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (06) : 2415 - 2424
  • [28] STUDY ON METHOD OF HIGH-SPEED RAILWAY BRIDGE PIER AND ABUTMENT PILE FOUNDATION SETTLEMENT LONG-TERM MONITORING
    Zhao, Jian
    Leng, Wuming
    Yang, Qi
    Xu, Fang
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 724 - 729
  • [29] Long-term settlement prediction of high-speed railway bridge pile foundation
    Qi Yang
    Wu-ming Leng
    Sheng Zhang
    Ru-song Nie
    Li-min Wei
    Chun-yan Zhao
    Wei-zheng Liu
    Journal of Central South University, 2014, 21 : 2415 - 2424
  • [30] Quasi-static test of the precast-concrete pile foundation for railway bridge construction
    Zhang, Xiyin
    Chen, Xingchong
    Wang, Yi
    Ding, Mingbo
    Lu, Jinhua
    Ma, Huajun
    ADVANCES IN CONCRETE CONSTRUCTION, 2020, 10 (01) : 49 - 59