Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation

被引:0
|
作者
Leng Wu-ming [1 ]
Yang Qi [1 ]
Nie Ru-song [1 ]
Yue Jian [1 ]
机构
[1] Cent S Univ, Sch Civil Engn, Changsha 410075, Hunan, Peoples R China
关键词
high-speed railway; bridge pile foundation; on-site monitoring; post-construction settlement; combination forecast model;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
A large number of accurate and reliable settlement data were obtained via on-site long-term monitoring test. The basic settlement law of pile foundation and characteristics of settlement curve were studied. Single forecast model was used to fit the monitoring data. The inadequacy that the evaluation of reasonable prediction model was limited to the correlation coefficient index in current guidebook was pointed out. It was proposed that mean-square error, mean absolute percentage error and average absolute error were introduced to comprehensively examine, evaluate the fitting effect and the reference value corresponding to the evaluation index was recommended. Combination forecast model for high-speed railway bridge post-construction settlement prediction was proposed; the characteristics of existing combination prediction models were analyzed and compared; specific steps and basic principles of bridge pile foundation post-construction settlement forecast were brought forward; and corresponding computer program was developed to improve forecast accuracy and efficiency. It was found that, by engineering examples, the optimal combination forecast method based on least-squares criterion could be thought of as the favor model owing to effectively and comprehensively improving the prediction accuracy. The valuable supplement and reference were provided to confirm reasonable time to construct railway and calculate post-construction settlement.
引用
收藏
页码:3341 / 3348
页数:8
相关论文
共 17 条
  • [1] COMBINATION OF FORECASTS
    BATES, JM
    GRANGER, CWJ
    [J]. OPERATIONAL RESEARCH QUARTERLY, 1969, 20 (04): : 451 - &
  • [2] Chen Hua-you, 2006, Journal of Systems Engineering, V21, P353
  • [3] A note on minimizing absolute percentage error in combined forecasts
    Lam, KF
    Mui, HW
    Yuen, HK
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (11) : 1141 - 1147
  • [4] [李秀珍 LI Xiuzhen], 2008, [自然灾害学报, Journal of Natural Disasters], V17, P53
  • [5] Lv WT, 2005, ROCK SOIL MECH, V26, P251
  • [6] [乔世范 Qiao Shifan], 2005, [中国铁道科学, China Railway Science], V26, P53
  • [7] [孙李红 SUN Li-hong], 2009, [系统工程理论与实践, Systems Engineering-Theory & Practice], V29, P84
  • [8] Tang X.W, 1993, FORECASTE, P46
  • [9] [王应明 Wang Yingming], 2002, [预测, Forecasting], V21, P58
  • [10] Wang ZS, 2011, ROCK SOIL MECH, V32, P1664