The application of workload control in assembly job shops: an assessment by simulation

被引:19
|
作者
Thuerer, Matthias [2 ]
Stevenson, Mark [1 ]
Silva, Cristovao [2 ]
Huang, George [3 ]
机构
[1] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster LA1 4YX, England
[2] Univ Coimbra, Dept Mech Engn, CEMUC, P-3030 Coimbra, Portugal
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
workload control; assembly job shop; job shop control; customer enquiry management; order release method; TO-ORDER COMPANIES; ASSIGNMENT PROCEDURES; DISPATCHING RULES; LEAD TIMES; RELEASE; PERFORMANCE; METHODOLOGY; MANAGEMENT; INDUSTRY; SYSTEM;
D O I
10.1080/00207543.2011.631600
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Workload control (WLC) is a production planning and control concept developed to meet the needs of small- and medium-sized make-to-order companies, where a job shop configuration is common. Although simulation has shown WLC can improve job shop performance, field researchers have encountered significant implementation challenges. One of the most notable challenges is the presence of 'assembly job shops' where product structures are more complex than typically modelled in simulation and where the final product consists of several sub-assemblies (or work orders) which have to be co-ordinated. WLC theory has not been developed sufficiently to handle such contexts, and the available literature on assembly job shops is limited. In response, this paper extends the applicability of WLC to assembly job shops by determining the best combination of: (i) WLC due date (DD) setting policy, (ii) release method and (iii) policy for coordinating the progress of work orders. When DDs are predominantly set by the company, the DD setting policy should play the leading role while the role of order release should be limited and the progress of work orders should not be co-ordinated in accordance with the DD of the final product. But when DDs are predominantly specified by customers, the importance of order release as a second workload balancing mechanism increases and work orders should be coordinated by backward scheduling from the DD of the final product. Results indicate that WLC can improve performance in assembly job shops and outperform alternative control policies. Future research should implement these findings in practice.
引用
收藏
页码:5048 / 5062
页数:15
相关论文
共 50 条
  • [21] Workload Control order release in general and pure flow shops with limited buffer size induced blocking: an assessment by simulation
    Thurer, Matthias
    Ma, Lin
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (08) : 2558 - 2569
  • [22] The use of labour flexibility for output control in workload controlled flow shops: A simulation analysis
    Portioli-Staudacher, Alberto
    Costa, Federica
    Thurer, Matthias
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020, 11 (03) : 429 - 442
  • [23] Assessing performance of Workload Control in High Variety Low Volumes MTO job shops: a simulative analysis
    Bertolini, Massimo
    Romagnoli, Giovanni
    Zammori, Francesco
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 362 - 370
  • [24] Improving the applicability of workload control (WLC): the influence of sequence-dependent set-up times on workload controlled job shops
    Thuerer, Matthias
    Silva, Cristovao
    Stevenson, Mark
    Land, Martin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (22) : 6419 - 6430
  • [25] Customer centric production planning and control in job shops: A simulation optimization approach
    Gucdemir, Hulya
    Selim, Hasan
    JOURNAL OF MANUFACTURING SYSTEMS, 2017, 43 : 100 - 116
  • [26] PRIORITY ASSIGNMENT PROCEDURES IN MULTILEVEL ASSEMBLY JOB SHOPS
    ADAM, NR
    BERTRAND, JWM
    SURKIS, J
    IIE TRANSACTIONS, 1987, 19 (03) : 317 - 328
  • [27] Lot splitting in the context of workload control: An assessment by simulation
    Instituto Politécnico de Castelo Branco, Av. do Empresário, Castelo Branco
    6000-767, Portugal
    不详
    4710-057, Portugal
    Rom. Rev. Precis. Mech. Opt. Mechatronics, 47 (53-56):
  • [28] Workload control and optimised order release: an assessment by simulation
    Fernandes, Nuno O.
    Thurer, Matthias
    Pinho, Tatiana M.
    Torres, Pedro
    Carmo-Silva, Silvio
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (10) : 3180 - 3193
  • [29] An algorithm for minimizing weighted earliness penalty in assembly job shops
    Pathumnakul, Supachai
    Egbelu, Pius J.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) : 230 - 245
  • [30] Towards an Integrated Workload Control (WLC) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders
    Thuerer, Matthias
    Stevenson, Mark
    Silva, Cristovao
    Land, Martin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (15) : 4502 - 4516