The application of workload control in assembly job shops: an assessment by simulation

被引:19
|
作者
Thuerer, Matthias [2 ]
Stevenson, Mark [1 ]
Silva, Cristovao [2 ]
Huang, George [3 ]
机构
[1] Univ Lancaster, Sch Management, Dept Management Sci, Lancaster LA1 4YX, England
[2] Univ Coimbra, Dept Mech Engn, CEMUC, P-3030 Coimbra, Portugal
[3] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
workload control; assembly job shop; job shop control; customer enquiry management; order release method; TO-ORDER COMPANIES; ASSIGNMENT PROCEDURES; DISPATCHING RULES; LEAD TIMES; RELEASE; PERFORMANCE; METHODOLOGY; MANAGEMENT; INDUSTRY; SYSTEM;
D O I
10.1080/00207543.2011.631600
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Workload control (WLC) is a production planning and control concept developed to meet the needs of small- and medium-sized make-to-order companies, where a job shop configuration is common. Although simulation has shown WLC can improve job shop performance, field researchers have encountered significant implementation challenges. One of the most notable challenges is the presence of 'assembly job shops' where product structures are more complex than typically modelled in simulation and where the final product consists of several sub-assemblies (or work orders) which have to be co-ordinated. WLC theory has not been developed sufficiently to handle such contexts, and the available literature on assembly job shops is limited. In response, this paper extends the applicability of WLC to assembly job shops by determining the best combination of: (i) WLC due date (DD) setting policy, (ii) release method and (iii) policy for coordinating the progress of work orders. When DDs are predominantly set by the company, the DD setting policy should play the leading role while the role of order release should be limited and the progress of work orders should not be co-ordinated in accordance with the DD of the final product. But when DDs are predominantly specified by customers, the importance of order release as a second workload balancing mechanism increases and work orders should be coordinated by backward scheduling from the DD of the final product. Results indicate that WLC can improve performance in assembly job shops and outperform alternative control policies. Future research should implement these findings in practice.
引用
收藏
页码:5048 / 5062
页数:15
相关论文
共 50 条
  • [11] Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation
    Thurer, Matthias
    Zhang, Haiwen
    Stevenson, Mark
    Costa, Federica
    Ma, Lin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (20) : 6336 - 6349
  • [12] Workload control in dual-resource constrained high-variety shops: an assessment by simulation
    Thurer, Matthias
    Stevenson, Mark
    Renna, Paolo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (03) : 931 - 947
  • [13] Workload control in additive manufacturing shops where post-processing is a constraint: an assessment by simulation
    Thurer, Matthias
    Huang, Yuan
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (14) : 4268 - 4286
  • [14] WORKLOAD BALANCING AND INVENTORY MINIMIZATION FOR JOB SHOPS
    SCHUSSEL, G
    JOURNAL OF INDUSTRIAL ENGINEERING, 1968, 19 (04): : 194 - &
  • [15] Job sequencing and selection within workload control order release: an assessment by simulation
    Thurer, Matthias
    Stevenson, Mark
    Qu, Ting
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 1061 - 1075
  • [16] The performance of Due Date setting rules in assembly and multi-stage job shops: an assessment by simulation
    Thuerer, Matthias
    Huang, George
    Stevenson, Mark
    Silva, Cristovao
    Godinho Filho, Moacir
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5949 - 5965
  • [17] Coping with finite storage space in job shops through order release control: an assessment by simulation
    Thuerer, Matthias
    Godinho Filho, Moacir
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (09) : 830 - 838
  • [18] Defining accurate delivery dates in make to order job-shops managed by workload control
    Davide Mezzogori
    Giovanni Romagnoli
    Francesco Zammori
    Flexible Services and Manufacturing Journal, 2021, 33 : 956 - 991
  • [19] Defining accurate delivery dates in make to order job-shops managed by workload control
    Mezzogori, Davide
    Romagnoli, Giovanni
    Zammori, Francesco
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2021, 33 (04) : 956 - 991
  • [20] INPUT CONTROL IN JOB SHOPS
    RAMAN, N
    IIE TRANSACTIONS, 1995, 27 (02) : 201 - 209