Single-machine slack due-window assignment and scheduling with past-sequence-dependent delivery times and controllable job processing times

被引:11
|
作者
Ji, Min [1 ]
Yao, Danli [1 ]
Ge, Jiaojiao [1 ]
Cheng, T. C. E. [1 ]
机构
[1] Zhejiang Gongshang Univ, Contemporary Business & Trade Res Ctr, Sch Comp Sci & Informat Engn, Hangzhou 310018, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
learning effect; scheduling; resource allocation; SLK due-window assignment; past-sequence-dependent delivery times; CONVEX RESOURCE CONSUMPTION; TOTAL COMPLETION-TIME; DATE ASSIGNMENT; WEIGHTED NUMBER; MAINTENANCE ACTIVITY; SETUP TIMES; COMMON; ALLOCATION; FLOWSHOP; MINIMIZE;
D O I
10.1504/EJIE.2015.074380
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we study single-machine scheduling that considers slack (SLK) due-window assignment, past-sequence-dependent delivery times and controllable job processing times simultaneously. We assume that the actual processing time of a job is a function of the learning effect on the job and resource allocation to the job and the job delivery time is proportional to its waiting time. The objective is to find jointly the optimal job sequence, optimal flow allowance value (i.e., optimal common waiting time) and optimal resource allocation to minimise a total cost comprising the earliness, tardiness, due-window-related and resource consumption costs. We consider two models of the job processing time function and provide polynomial-time solution algorithms for the corresponding problems. We also provide a more efficient solution algorithm for a special case of the problem.
引用
收藏
页码:794 / 818
页数:25
相关论文
共 50 条
  • [41] Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times
    Na Yin
    Ji-Bo Wang
    Dan Wang
    Li-Yan Wang
    Xiao-Yuan Wang
    The International Journal of Advanced Manufacturing Technology, 2010, 46 : 707 - 714
  • [42] Single-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenance
    Yang, Suh-Jenq
    Yang, Dar-Li
    Cheng, T. C. E.
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (08) : 1510 - 1514
  • [43] New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 278 (01) : 149 - 159
  • [44] A note on deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times
    Shen, Peng
    Wei, Cai-Min
    Wu, Yu-Bin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (5-8): : 723 - 725
  • [45] Comments on “Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times”
    Dehua Xu
    Na Yin
    Ji-Bo Wang
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1147 - 1148
  • [46] Note to: Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times
    Huang, Xue
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (5-8): : 763 - 764
  • [47] Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect
    Yin, Yunqiang
    Xu, Dehua
    Wang, Jiayin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12): : 1123 - 1132
  • [48] Note to: Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times
    Xue Huang
    The International Journal of Advanced Manufacturing Technology, 2012, 58 : 763 - 764
  • [49] Some single-machine scheduling problems with past-sequence-dependent setup times and a general learning effect
    Yunqiang Yin
    Dehua Xu
    Jiayin Wang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 1123 - 1132
  • [50] Comments on "Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times"
    Xu, Dehua
    Yin, Na
    Wang, Ji-Bo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1147 - 1148