共 50 条
- [23] Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1221 - 1226
- [24] SINGLE-MACHINE SCHEDULING PROBLEMS WITH PAST-SEQUENCE-DEPENDENT DELIVERY TIMES AND DETERIORATION AND LEARNING EFFECTS SIMULTANEOUSLY INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2013, 9 (10): : 3981 - 3989
- [25] Single Machine Scheduling with Past-sequence-dependent Delivery Times and Learning Effect 2013 10TH IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2013, : 574 - 578
- [26] Minmax scheduling and due-window assignment with position-dependent processing times and job rejection 4OR, 2020, 18 : 439 - 456
- [27] Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1221 - 1226
- [28] Single machine common due window scheduling with controllable job processing times Combinatorial Optimization and Applications, Proceedings, 2007, 4616 : 279 - 290
- [29] Minmax scheduling and due-window assignment with position-dependent processing times and job rejection 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2020, 18 (04): : 439 - 456