Collaboration and opportunism as mediators of the relationship between NPD project uncertainty and NPD project performance

被引:87
|
作者
Um, Ki-Hyun [1 ]
Kim, Sang-Man [2 ]
机构
[1] Dongguk Univ, Survey & Hlth Policy Res Ctr, 30 Pildong Ro 1gil, Seoul, South Korea
[2] Kyung Hee Univ, Sch Management, 1 Hoegi Dong, Seoul, South Korea
关键词
Project uncertainty; Collaboration; Opportunism; Project performance; NPD projects; CONFIRMATORY FACTOR-ANALYSIS; PRODUCT DEVELOPMENT; BUYER-SUPPLIER; COMPLEXITY; INTEGRATION; CONSTRUCTION; PERSPECTIVES; CAPABILITIES; INVARIANCE; INNOVATION;
D O I
10.1016/j.ijproman.2018.01.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study aims to conceptualize NPD (New Product Development) project uncertainty and investigate how the project uncertainty influences project performance through collaboration and opportunism. An empirical examination is conducted to test such relationships within the scope of Korean manufacturing firms, which are currently engaging in NPD projects with their key partner. Structural equation modeling (SEM) is performed to prove proposed hypotheses. The empirical findings suggested that higher level of project uncertainty leads to collaboration and opportunism and that these two factors come into play in project performance in an opposing way: collaboration serves as a driver of project performance whereas opportunism acts as a barrier against it. (C) 2018 Elsevier Ltd, APM and IPMA. All rights reserved.
引用
收藏
页码:659 / 672
页数:14
相关论文
共 50 条
  • [41] Collaboration expectation gaps, transparency and integrated NPD performance: A multi-case study
    DeCampos, Hugo A.
    Fawcett, Stanley E.
    Melnyk, Steven A.
    JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2022, 28 (04)
  • [42] The relationship between brokers' influence, strength of ties and NPD project outcomes in innovation-driven horizontal networks (vol 26, pg 571, 2008)
    Oke, Adegoke
    Idiagbon-Oke, Moronke
    Walumbwa, Fred
    JOURNAL OF OPERATIONS MANAGEMENT, 2015, 33-34 : 155 - 155
  • [43] Supplier involvement in NPD projects: the buyer's perspective on the complementary roles of social capital and social exchange for project performance
    Benhayoun, Lamiae
    Le-Dain, Marie-Anne
    Saikouk, Tarik
    Schiele, Holger
    Calvi, Richard
    INTERNATIONAL JOURNAL OF LOGISTICS MANAGEMENT, 2024, 35 (02) : 425 - 455
  • [44] Assessing Integration between Project Management with NPD Process in Heavy Industrial Components Industry and Developing a Framework to align them
    Rawat, Sonam
    Divekar, Rajiv
    SHAPING THE FUTURE OF BUSINESS AND SOCIETY - SYMBIOSIS INSTITUTE OF MANAGEMENT STUDIES (SIMS), 2014, 11 : 726 - 736
  • [45] Finding the sweet spot: effects of exporting on the relationship between R&D investment and NPD performance
    Sousa, Carlos M. P.
    Tsinopoulos, Christos
    Yan, Ji
    Benito, Gabriel R. G.
    INTERNATIONAL MARKETING REVIEW, 2025, 42 (01) : 35 - 63
  • [46] UNDERSTANDING THE RELATIONSHIP BETWEEN TASK CONFLICT AND CONSTRUCTION PROJECT PERFORMANCE: UNCERTAINTY MANAGEMENT PERSPECTIVE
    Jia, Jianyao
    Gan, Xueqing
    Liu, Kangning
    Le, Yun
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2024, 30 (06) : 536 - 550
  • [47] Integration of Technology Roadmapping and Project Portfolio Management to Improve the Front-End of NPD Process
    Oliveira, Maicon G.
    Rozenfeld, Henrique
    PROCEEDINGS OF PICMET 09 - TECHNOLOGY MANAGEMENT IN THE AGE OF FUNDAMENTAL CHANGE, VOLS 1-5, 2009, : 2037 - 2046
  • [48] AHP-FMEA-DA multi-criteria method for NPD project launch analysis
    Garcia Aguirre, Pedro Angel
    Perez-Dominguez, Luis
    Luviano-Cruz, David
    Solano-Noriega, Jaime
    Carolina Cordero-Diaz, Marling
    INTERNATIONAL JOURNAL OF INNOVATION AND SUSTAINABLE DEVELOPMENT, 2023, 17 (1-2) : 138 - 151
  • [49] Communication channels, innovation tasks and NPD project outcomes in innovation-driven horizontal networks
    Oke, Adegoke
    Idiagbon-Oke, Moronke
    JOURNAL OF OPERATIONS MANAGEMENT, 2010, 28 (05) : 442 - 453
  • [50] Relationship between project interaction and performance indicators
    Pocock, JB
    Hyun, CT
    Liu, LY
    Kim, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02): : 165 - 176