Collaboration and opportunism as mediators of the relationship between NPD project uncertainty and NPD project performance

被引:87
|
作者
Um, Ki-Hyun [1 ]
Kim, Sang-Man [2 ]
机构
[1] Dongguk Univ, Survey & Hlth Policy Res Ctr, 30 Pildong Ro 1gil, Seoul, South Korea
[2] Kyung Hee Univ, Sch Management, 1 Hoegi Dong, Seoul, South Korea
关键词
Project uncertainty; Collaboration; Opportunism; Project performance; NPD projects; CONFIRMATORY FACTOR-ANALYSIS; PRODUCT DEVELOPMENT; BUYER-SUPPLIER; COMPLEXITY; INTEGRATION; CONSTRUCTION; PERSPECTIVES; CAPABILITIES; INVARIANCE; INNOVATION;
D O I
10.1016/j.ijproman.2018.01.006
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study aims to conceptualize NPD (New Product Development) project uncertainty and investigate how the project uncertainty influences project performance through collaboration and opportunism. An empirical examination is conducted to test such relationships within the scope of Korean manufacturing firms, which are currently engaging in NPD projects with their key partner. Structural equation modeling (SEM) is performed to prove proposed hypotheses. The empirical findings suggested that higher level of project uncertainty leads to collaboration and opportunism and that these two factors come into play in project performance in an opposing way: collaboration serves as a driver of project performance whereas opportunism acts as a barrier against it. (C) 2018 Elsevier Ltd, APM and IPMA. All rights reserved.
引用
收藏
页码:659 / 672
页数:14
相关论文
共 50 条
  • [31] Use of Virtual Mobility to Facilitate Modern Project-Based NPD Education
    Vukasinovic, Nikola
    Pavkovic, Neven
    INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2017, 33 (06) : 2008 - 2019
  • [32] Co-locating NPD? The need for combining project focus and organizational integration
    Lakemond, N
    Berggren, C
    TECHNOVATION, 2006, 26 (07) : 807 - 819
  • [33] RETRACTED: The relationship between brokers' influence, strength of ties and NPD project outcomes in innovation-driven horizontal networks (Retracted Article)
    Oke, Adegoke
    Idiagbon-Oke, Moronke
    Walurnbwa, Fred
    JOURNAL OF OPERATIONS MANAGEMENT, 2008, 26 (05) : 571 - 589
  • [34] Investigating the Relationship between IS Project Risk and Project Performance
    Wu, Chun-Hui
    Wang, Shiow-Luan
    Fang, Kwoting
    THIRD 2008 INTERNATIONAL CONFERENCE ON CONVERGENCE AND HYBRID INFORMATION TECHNOLOGY, VOL 2, PROCEEDINGS, 2008, : 100 - +
  • [35] Moderating roles of organizational inertia and project duration in the NPD process: an empirical investigation
    Mishra, Shashi
    Saji, K.
    JOURNAL OF PRODUCT AND BRAND MANAGEMENT, 2013, 22 (01): : 52 - +
  • [36] THE INFLUENCE OF A COMPANY'S STRATEGY ON CREATIVITY AND PROJECT RESULTS IN AN NPD - CASE STUDY
    Vukasinovic, Nikola
    Fain, Nusa
    Duhovnik, Joze
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 11): IMPACTING SOCIETY THROUGH ENGINEERING DESIGN, VOL 1: DESIGN PROCESSES, 2011, 1 : 366 - 372
  • [37] Is the formalization of NPD collaboration productive or counterproductive? Contingent effects of trust between partners
    Pemartin, Maria
    Rodriguez-Escudero, Ana, I
    BRQ-BUSINESS RESEARCH QUARTERLY, 2021, 24 (01) : 2 - 18
  • [38] Collaboration between competitors' NPD teams: in search of effective modes of management control
    Smets, Lydie P. M.
    Langerak, Fred
    Tatikonda, Mohan V.
    R & D MANAGEMENT, 2016, 46 : 244 - 260
  • [39] The relationship between customer collaboration and software project overruns
    Molokken-Ostvold, Kjetil
    Furulund, Kristian Marius
    AGILE 2007, PROCEEDINGS, 2007, : 72 - +
  • [40] Relationship between project performance and accidents
    Rodriguez, YA
    Jaselskis, EJ
    Russell, JS
    IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1996, : 251 - 257