共 50 条
- [34] Investigating the Relationship between IS Project Risk and Project Performance THIRD 2008 INTERNATIONAL CONFERENCE ON CONVERGENCE AND HYBRID INFORMATION TECHNOLOGY, VOL 2, PROCEEDINGS, 2008, : 100 - +
- [35] Moderating roles of organizational inertia and project duration in the NPD process: an empirical investigation JOURNAL OF PRODUCT AND BRAND MANAGEMENT, 2013, 22 (01): : 52 - +
- [36] THE INFLUENCE OF A COMPANY'S STRATEGY ON CREATIVITY AND PROJECT RESULTS IN AN NPD - CASE STUDY PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 11): IMPACTING SOCIETY THROUGH ENGINEERING DESIGN, VOL 1: DESIGN PROCESSES, 2011, 1 : 366 - 372
- [39] The relationship between customer collaboration and software project overruns AGILE 2007, PROCEEDINGS, 2007, : 72 - +
- [40] Relationship between project performance and accidents IMPLEMENTATION OF SAFETY AND HEALTH ON CONSTRUCTION SITES, 1996, : 251 - 257