Dynamic Risk Assessment of High Slope in Open-Pit Coalmines Based on Interval Trapezoidal Fuzzy Soft Set Method: A Case Study

被引:6
|
作者
Wang, Zhiliu [1 ]
Hu, Mengxin [1 ]
Zhang, Peng [2 ]
Li, Xinming [1 ]
Yin, Song [1 ]
机构
[1] Zhongyuan Univ Technol, Sch Civil Engn & Architecture, Zhengzhou 450007, Peoples R China
[2] CHN Baorixile Energy Co Ltd, Hulunbuir 021599, Peoples R China
关键词
dynamic risk assessment; safety management and control; high slope; open-pit coalmine; STABILITY ANALYSIS; FAILURE; MODEL; PROBABILITY; SYSTEM; AHP;
D O I
10.3390/pr10112168
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Effective high slope risk assessment plays an important role in the safety management and control of the open-pit coal mining process. Traditional slope stability risk assessment methods rarely consider the time factor or evaluate the dynamic change of high slope in an open-pit mine at a certain time in a sensitivity assessment. This paper develops an interval trapezoidal fuzzy soft set method to achieve the high slope dynamic risk evaluation. The proposed dynamic interval trapezoidal fuzzy soft set method for risk assessment of high slope in an open-pit coal mine is developed by integrating the time points and weights of slope risk factors. The extended interval trapezoidal fuzzy soft set was used to calculate the weights of risk factors at different times, and the Fuzzy Analytical Hierarchy Process (FAHP) method was applied to determine the weights of risk factors. The weight change of different risk factors with time can be easily achieved with the proposed method. As a case study, this approach is implemented into a risk assessment model for the north high slope in Shengli #1 open-pit mine located in Xilinhot, Inner Mongolia. The model complies with three time points and contains 4 primary risk factors (S) and 17 secondary risk factors. The results indicated that the hydrological climate conditions and slope geometry conditions were the high risk factors affecting this open-pit coal mine slope. The reasonability and effectiveness of the evaluation results were verified with in-situ observations and measurements. This dynamic risk assessment method is helpful for improving safety management and control for the high slopes of open-pit mines in the coal mining process.
引用
收藏
页数:20
相关论文
共 37 条
  • [31] Improving the urban heritage based on a tourism risk assessment using a hybrid fuzzy MADM method: The case study of Tehran's central district
    Hosseini, Ali
    Pourahmad, Ahmad
    Ayashi, Athareh
    Tzeng, Gwo-Hshiung
    Banaitis, Audrius
    Pourahmad, Atiyeh
    JOURNAL OF MULTI-CRITERIA DECISION ANALYSIS, 2021, 28 (5-6) : 248 - 268
  • [32] Fuzzy logic-based user interface design for risk assessment considering human factor: A case study for high-voltage cell
    Aras, Faruk
    Karakas, Ercuement
    Bicen, Yunus
    SAFETY SCIENCE, 2014, 70 : 387 - 396
  • [33] Debris flows dynamic risk assessment and interpretable Shapley method-based driving mechanisms exploring - A case study of the upper reach of the Min River
    He, Yufeng
    Ding, Mingtao
    Duan, Yu
    Zheng, Hao
    He, Wen
    Liu, Jun
    ECOLOGICAL INDICATORS, 2025, 173
  • [34] A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study
    Mirnezami, Seyed Ali
    Mousavi, Seyed Meysam
    Mohagheghi, Vahid
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2020, 95 (95)
  • [35] Railway Safety Risk Assessment and Control Optimization Method Based on FTA-FPN: A Case Study of Chinese High-Speed Railway Station
    Zhang, Qi
    Zhuang, Yanhui
    Wei, Yuguang
    Jiang, Hao
    Yang, Hao
    JOURNAL OF ADVANCED TRANSPORTATION, 2020, 2020 (2020)
  • [36] A novel qualitative risk assessment using the interval-valued spherical fuzzy extension of TOPSIS method: a case study in rail transit systems (DEC, 10.1007/s00521-023-09224-2, 2023)
    Ak, Muhammet Fatih
    Demir, Emre
    NEURAL COMPUTING & APPLICATIONS, 2024, 36 (10): : 5133 - 5133
  • [37] Risk Assessment Method for the Safe Operation of Long-Distance Pipeline Stations in High-Consequence Areas Based on Fault Tree Construction: Case Study of China-Myanmar Natural Gas Pipeline Branch Station
    Xu, Jiarui
    Jiang, Fengshan
    Xie, Zhiqiang
    Wang, Guofang
    ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2023, 9 (01)