Dynamic Risk Assessment of High Slope in Open-Pit Coalmines Based on Interval Trapezoidal Fuzzy Soft Set Method: A Case Study

被引:6
|
作者
Wang, Zhiliu [1 ]
Hu, Mengxin [1 ]
Zhang, Peng [2 ]
Li, Xinming [1 ]
Yin, Song [1 ]
机构
[1] Zhongyuan Univ Technol, Sch Civil Engn & Architecture, Zhengzhou 450007, Peoples R China
[2] CHN Baorixile Energy Co Ltd, Hulunbuir 021599, Peoples R China
关键词
dynamic risk assessment; safety management and control; high slope; open-pit coalmine; STABILITY ANALYSIS; FAILURE; MODEL; PROBABILITY; SYSTEM; AHP;
D O I
10.3390/pr10112168
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Effective high slope risk assessment plays an important role in the safety management and control of the open-pit coal mining process. Traditional slope stability risk assessment methods rarely consider the time factor or evaluate the dynamic change of high slope in an open-pit mine at a certain time in a sensitivity assessment. This paper develops an interval trapezoidal fuzzy soft set method to achieve the high slope dynamic risk evaluation. The proposed dynamic interval trapezoidal fuzzy soft set method for risk assessment of high slope in an open-pit coal mine is developed by integrating the time points and weights of slope risk factors. The extended interval trapezoidal fuzzy soft set was used to calculate the weights of risk factors at different times, and the Fuzzy Analytical Hierarchy Process (FAHP) method was applied to determine the weights of risk factors. The weight change of different risk factors with time can be easily achieved with the proposed method. As a case study, this approach is implemented into a risk assessment model for the north high slope in Shengli #1 open-pit mine located in Xilinhot, Inner Mongolia. The model complies with three time points and contains 4 primary risk factors (S) and 17 secondary risk factors. The results indicated that the hydrological climate conditions and slope geometry conditions were the high risk factors affecting this open-pit coal mine slope. The reasonability and effectiveness of the evaluation results were verified with in-situ observations and measurements. This dynamic risk assessment method is helpful for improving safety management and control for the high slopes of open-pit mines in the coal mining process.
引用
收藏
页数:20
相关论文
共 37 条
  • [21] A Bayesian Network Inference Approach for Dynamic Risk Assessment Using Multisource-Based Information Fusion in an Interval Type-2 Fuzzy Set Environment
    Xu, Jintao
    Sui, Yang
    Dai, Tao
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2024, 32 (10) : 5702 - 5713
  • [22] Landscape Analysis and Ecological Risk Assessment during 1995-2020 Based on Land Utilization/Land Coverage (LULC) and Random Forest: A Case Study of the Fushun Open-Pit Coal Area in Liaoning, China
    Xu, Hua
    Cheng, Weiming
    SUSTAINABILITY, 2024, 16 (06)
  • [23] Assessment of bio-medical waste disposal techniques using interval-valued q-rung orthopair fuzzy soft set based EDAS method
    Zulqarnain, Rana Muhammad
    Naveed, Hamza
    Askar, Sameh
    Deveci, Muhammet
    Siddique, Imran
    Castillo, Oscar
    ARTIFICIAL INTELLIGENCE REVIEW, 2024, 57 (08)
  • [24] Dynamic Risk Assessment of Karst Tunnel Collapse Based on Fuzzy-AHP: A Case Study of the LianHuaShan Tunnel, China
    Yu, Yongyan
    He, Xiaobin
    Wan, Fei
    Bai, Zhe
    Fu, Chongtao
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [25] A novel qualitative risk assessment using the interval-valued spherical fuzzy extension of TOPSIS method: a case study in rail transit systems
    Muhammet Fatih Ak
    Emre Demir
    Neural Computing and Applications, 2024, 36 : 5109 - 5132
  • [26] A novel qualitative risk assessment using the interval-valued spherical fuzzy extension of TOPSIS method: a case study in rail transit systems
    Ak, Muhammet Fatih
    Demir, Emre
    NEURAL COMPUTING & APPLICATIONS, 2023, 36 (10): : 5109 - 5132
  • [27] Correction: A novel qualitative risk assessment using the interval-valued spherical fuzzy extension of TOPSIS method: a case study in rail transit systems
    Muhammet Fatih Ak
    Emre Demir
    Neural Computing and Applications, 2024, 36 : 5133 - 5133
  • [28] Groundwater health risk assessment and its temporal and spatial evolution based on trapezoidal fuzzy number-Monte Carlo stochastic simulation: A case study in western Jilin province
    Li, Tao
    Bian, Jianmin
    Ruan, Dongmei
    Xu, Liwen
    Zhang, Siting
    ECOTOXICOLOGY AND ENVIRONMENTAL SAFETY, 2024, 282
  • [29] A Novel Risk Assessment Approach for Open-Cast Coal Mines Using Hybrid MCDM Models with Interval Type-2 Fuzzy Sets: A Case Study in Türkiye
    Mutlu, Mert
    Cetin, Nazli Ceren
    Onder, Seyhan
    SYSTEMS, 2024, 12 (08):
  • [30] Failure risk assessment by multi-state dynamic Bayesian network based on interval type-2 fuzzy sets and leaky-weighted sum algorithm: A case study of crude oil pipelines
    Liu, Jiawei
    Li, Xiufeng
    Zhang, Yixin
    Li, Tao
    Wei, Liping
    Wu, Wei
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 250