Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels

被引:177
|
作者
Hyun, Ki-Chang [1 ]
Min, Sangyoon [2 ]
Choi, Hangseok [3 ]
Park, Jeongjun [3 ]
Lee, In-Mo [3 ]
机构
[1] Hyundai E&C, Res & Dev Div, Seoul, South Korea
[2] Parsons Corp, Boston, MA USA
[3] Korea Univ, Sch Civil Environm & Architectural Engn, Seoul, South Korea
关键词
Shield TBM; Risk analysis; Fault-tree analysis (FTA); Analytic hierarchy process (AHP);
D O I
10.1016/j.tust.2015.04.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, the potential risk of undesirable events occurring during tunneling with application of a shield tunnel boring machine (TBM) method is discussed along with the risk analysis which can systematically assess overall risk levels. Potential risks and typical scenarios pertaining to shield TBM tunnels have been investigated based on previous case histories and correspondence with experts. The relevant risks from undesirable events were categorized into four groups: cutter-related malfunction, machine blockage or hold-up, mucking problems that hinder transporting excavated materials, and segment defects. A fault-tree set was constructed by grouping risk factors (or causes) into geological, design and construction/management factors. Risk analysis was performed by adopting fault-tree analysis (FTA) and an analytic hierarchy process (AHP) with consideration of the probability and impact of the risks. In addition, the proposed method was reliably validated by comparison with field observation, and thus indicates its applicability to risk management for shield TBM tunneling. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:121 / 129
页数:9
相关论文
共 50 条
  • [41] Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis
    Abdelgawad, Mohamed
    Fayek, Aminah Robinson
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2011, 137 (04) : 294 - 302
  • [42] Safety risk identification and prioritize of forest logging activities using analytic hierarchy process (AHP)
    Unver, Saliha
    Ergenc, Ibrahim
    ALEXANDRIA ENGINEERING JOURNAL, 2021, 60 (01) : 1591 - 1599
  • [43] RISK ASSESSMENT OF DRY BULK CARGO OPERATIONS USING ANALYTIC HIERARCHY PROCESS (AHP) METHOD
    Roshamida, A. J.
    Amir, Mohamad Abu Ubaidah
    Zulkifly, M. R.
    2016 PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY (ICICTM), 2016, : 146 - 159
  • [44] Priority decision of risk management for Chinese fisheries by using an analytic hierarchy process (AHP) approach
    Hengbin, Y.
    Zhuo, C.
    Mohsin, M.
    Seongjin, C.
    INDIAN JOURNAL OF GEO-MARINE SCIENCES, 2021, 50 (05) : 410 - 418
  • [45] A Comprehensive Investigation on the Fire Hazards and Environmental Risks in a Commercial Complex Based on Fault Tree Analysis and the Analytic Hierarchy Process
    Wang, Yongyu
    Ni, Xiaoyang
    Wang, Jie
    Hu, Ziyi
    Lu, Kaihua
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (19) : 1 - 11
  • [46] Modernization readiness analysis of Belitang irrigation system at region level using analytic hierarchy process (AHP) method
    Imron, F.
    Murtiningrum
    2ND INTERNATIONAL CONFERENCE ON AGRICULTURAL TECHNOLOGY, ENGINEERING AND ENVIRONMENTAL SCIENCES, 2021, 644
  • [47] The application of using Fault Tree Analysis (FTA) in the evaluation of ISO 9000 standard
    Aghaie, A
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, 2000, : 484 - 488
  • [48] Using intuitionistic fuzzy sets for fault-tree analysis on printed circuit board assembly
    Shu, Ming-Hung
    Cheng, Ching-Hsue
    Chang, Jing-Rong
    MICROELECTRONICS RELIABILITY, 2006, 46 (12) : 2139 - 2148
  • [49] Perspective of Using Analytic Hierarchy Process in the Procedure of Conjoint Analysis
    Sugiura, Shin
    Sugiura, Akiko
    INTERNATIONAL JOURNAL OF AFFECTIVE ENGINEERING, 2024, 23 (02): : 87 - 93
  • [50] CRITICALITY ANALYSIS OF SPARE PARTS USING THE ANALYTIC HIERARCHY PROCESS
    GAJPAL, PP
    GANESH, LS
    RAJENDRAN, C
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 35 (1-3) : 293 - 297