共 50 条
- [42] Study on Comprehensive Evaluation of Mine Construction Project Management Based on AHP-FUZZY 4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 237
- [43] Risk Assessment of Electric Power Construction Project Based on AHP and the Fuzzy Comprehensive Evaluation PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 695 - 702
- [44] Metro construction safety risk assessment based on the fuzzy AHP and the comprehensive evaluation method ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1243 - 1248
- [45] Comprehensive Evaluation of Tourist Satisfaction Degree about Scenic Spot Based on Gray AHP INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 3138 - 3140
- [47] Research on Comprehensive Evaluation of the Students' Vocational Ability Based on AHP-FUZZY 2012 INTERNATIONAL CONFERENCE ON CONTROL ENGINEERING AND COMMUNICATION TECHNOLOGY (ICCECT 2012), 2012, : 791 - 793
- [49] Safety Evaluation of Construction Based on the Improved AHP-Grey Model Wireless Personal Communications, 2018, 103 : 209 - 219