Research on the Risk of Large Scale Gymnasiums BOT Financing and Risk Management

被引:0
|
作者
Li Hongchang [1 ]
Li Hongyu [1 ]
机构
[1] Beihua Univ, Sch Phys Educ, Jilin 132013, Jilin, Peoples R China
关键词
BOT model; gymnasium; financing; risk;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the growing demand of Large Scale Gymnasiums and the tight budget on the government. BOT is one of the best alternatives to solve this problem. However, in order to create a successful BOT project, it is necessary to avoid controllable capital structure risk, completion risk and revenue risk, etc. First, the concept of BOT risk and risk management is introduced. The paper aims to study the BOT model in the investment and financing system of the large scale gymnasiums in china and understand the present situation of BOT financing by analyzing the significance and features of risks. The specific categories of risks are classified into uncontrollable and controllable risks theoretically. Some strategies are proposed to deal with different categories of risks.
引用
收藏
页码:200 / 205
页数:6
相关论文
共 50 条
  • [21] RESEARCH ON RISK MANAGEMENT OF LARGE-SCALE SOFTWARE PROJECT BASED ON CONSUMER'S DEMAND
    Deng, Xiuquan
    Ma, Zhe
    PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2456 - 2462
  • [22] Research on the Development of Domestic and Foreign Large-Scale Public Gymnasiums Operation Mode
    Qian, Cheng
    2ND INTERNATIONAL CONFERENCE ON SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS (SMTA 2015), 2015, : 824 - 828
  • [23] An Evaluation Model of Financing Risk for Large-Scale Water Conservancy Construction Project
    Su, Wangshu
    Zhang, Wang
    PROCEEDINGS 2016 EIGHTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION ICMTMA 2016, 2016, : 81 - 84
  • [24] Risk management and research of large coal chemical projects
    Xiong G.
    Xiong, Guanghui (xgh0416@126.com), 1600, Italian Association of Chemical Engineering - AIDIC (59): : 1099 - 1104
  • [25] Evaluating the risk of BOT project financing on the basis of multilevel grey system theory
    Lin, Feng
    Wang, Xiuqin
    Deng, Tiejun
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 244 - 250
  • [26] Research on the Financing and Risk Management of Real Estate Enterprises during Financial Crisis
    Li Ying
    Han Meini
    Li Wei
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2009, : 331 - +
  • [27] Research on Risk Management Strategy in Purchase-Order Financing Business of Bank
    Zhang, Li
    An, Zhiyu
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ECONOMIC AND BUSINESS MANAGEMENT 2016, 2016, 16 : 385 - 390
  • [28] RISK AND RETURNS: Large-scale Funding for Urban Research
    Keith, Michael
    Parnell, Susan
    INTERNATIONAL JOURNAL OF URBAN AND REGIONAL RESEARCH, 2023, 47 (02) : 299 - 304
  • [29] Risk management in large-scale railway infrastructure projects
    Gardin, D.
    2001, International Railway Congress Association (32):
  • [30] Risk management in large-scale information system projects
    Castillo-Nopo, Diego Armando
    Loyola-Blanco, Khateryn Fiorela
    Castro-Marca, Raul
    Rosa-Gavino, Gian Davor La
    Aragon-Retuerto, Jherson Giovanny
    Rafael-Sifuentes, Hegel Alvaro
    Marin-Rodriguez, William Joel
    EAI ENDORSED TRANSACTIONS ON SCALABLE INFORMATION SYSTEMS, 2024, 11 (04): : 1 - 10