Evaluating the risk of BOT project financing on the basis of multilevel grey system theory

被引:0
|
作者
Lin, Feng
Wang, Xiuqin
Deng, Tiejun
机构
关键词
Project Financing; Grey Systematical Theory; Analytic Hierarchy Process;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
BOT Project financing has already been adopted extensively in our country. But it is particularly important to evaluate the risk of project financing because of its characteristic such as project leading, limited recourse and long period. This article sets up the index system on risk evaluation of BOT project financing according to the multianalysis of the risk of project financing. The multilevel gray evaluation method that qualitative and quantitative analytic has been adopted in evaluate index system. The application of the method shows that the evaluation method is practical.
引用
收藏
页码:244 / 250
页数:7
相关论文
共 50 条
  • [1] Risk Assessment of Expressway BOT Project Based on Grey Hierarchy Theory
    Hu Yuting
    Mu Lan
    Liu Zhanliang
    [J]. ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 16 - +
  • [2] Investigation of Grey System Theory in Engineering Project Risk Management
    Yang Wanbin
    Qu Zhiming
    [J]. ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL IV, PROCEEDINGS, 2009, : 395 - +
  • [3] RISK MANAGEMENT IN PROJECT FINANCING ON THE BASIS OF REVERSE CALCULATIONS
    Sierikov, A. V.
    Marchenko, O. V.
    [J]. ACTUAL PROBLEMS OF ECONOMICS, 2009, (95): : 272 - 277
  • [4] Evaluate the risk of real estate investment project based on the Grey System Theory
    Yuan Zhixue
    Chen Jingwu
    [J]. PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 866 - 869
  • [5] The application of grey system theory in Asset Securitization Project
    Wang, Jianhui
    [J]. JOURNAL OF GREY SYSTEM, 2007, 19 (03): : 247 - 256
  • [6] Study on risk evaluation index system to expressway BOT project
    Xie, Zhonghui
    Li, Shucheng
    Du, Peng
    [J]. Sixth Wuhan International Conference on E-Business, Vols 1-4: MANAGEMENT CHALLENGES IN A GLOBAL WORLD, 2007, : 1638 - 1643
  • [7] Risk evaluation index system and methods of BOT project finance
    Huang, XY
    Xiong, F
    Gao, XJ
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
  • [8] A Model of Risk Assessment of Software Project Based on Grey Theory
    Pang Qinghua
    [J]. ICCSSE 2009: PROCEEDINGS OF 2009 4TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION, 2009, : 538 - 541
  • [9] Occupational risk assessment with grey system theory
    Marcin Nowak
    Rafał Mierzwiak
    Marcin Butlewski
    [J]. Central European Journal of Operations Research, 2020, 28 : 717 - 732
  • [10] Occupational risk assessment with grey system theory
    Nowak, Marcin
    Mierzwiak, Rafal
    Butlewski, Marcin
    [J]. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2020, 28 (02) : 717 - 732