Evaluating the risk of BOT project financing on the basis of multilevel grey system theory

被引:0
|
作者
Lin, Feng
Wang, Xiuqin
Deng, Tiejun
机构
关键词
Project Financing; Grey Systematical Theory; Analytic Hierarchy Process;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
BOT Project financing has already been adopted extensively in our country. But it is particularly important to evaluate the risk of project financing because of its characteristic such as project leading, limited recourse and long period. This article sets up the index system on risk evaluation of BOT project financing according to the multianalysis of the risk of project financing. The multilevel gray evaluation method that qualitative and quantitative analytic has been adopted in evaluate index system. The application of the method shows that the evaluation method is practical.
引用
收藏
页码:244 / 250
页数:7
相关论文
共 50 条
  • [41] Evaluating the Collaborative Security of Water-Energy-Food in China on the Basis of Symbiotic System Theory
    Li, Xiao
    Liu, Cuishan
    Wang, Guoqing
    Bao, Zhenxin
    Diao, Yanfang
    Liu, Jing
    [J]. WATER, 2021, 13 (08)
  • [42] Research on Business Risk Assessment Model of City Commercial Banks Based on Grey System Theory
    Ren, Shuming
    Wang, Dandan
    Wang, Hongjing
    [J]. APPLIED INFORMATICS AND COMMUNICATION, PT 5, 2011, 228 : 30 - 37
  • [43] A Study on the Assessment of Power System Security Risk based on Grey Clustering and Maximum Entropy Theory
    Peng, Peng
    Mi Chuanmin
    Liu Sifeng
    Jing, Tao
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 3002 - 3007
  • [44] Research on Business Risk Assessment Model of City Commercial Banks based on Grey System Theory
    Ren, Shuming
    Wang, Dandan
    Wang, Hongjing
    [J]. 2010 THE 3RD INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND INDUSTRIAL APPLICATION (PACIIA2010), VOL V, 2010, : 28 - 31
  • [45] Pre - risk Evaluation of Engineering Project Construction Based on Gray System Theory
    Yu, Miao
    [J]. PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING (ESSAEME 2017), 2017, 119 : 1349 - 1352
  • [46] Research of Financing Risk Management about Large-Scale Tourism Scenic Based on the Four Quadrant Project Divided Theory
    Li, Ying-hui
    Liu, Fang-qiang
    [J]. NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 104 - 107
  • [47] Evaluating the Coupling Coordination Degree of Green Finance and Marine Eco-environment Based on AHP and Grey System Theory
    Zhu, Feng
    [J]. JOURNAL OF COASTAL RESEARCH, 2020, : 277 - 281
  • [48] An optimal classification method for risk assessment of water inrush in karst tunnels based on grey system theory
    Zhou, Z. Q.
    Li, S. C.
    Li, L. P.
    Shi, S. S.
    Xu, Z. H.
    [J]. GEOMECHANICS AND ENGINEERING, 2015, 8 (05) : 631 - 647
  • [49] The Merapi-project -: Interdisciplinary monitoring of a high-risk volcano as a basis for an early warning system
    Zschau, J
    Sukhyar, R
    Purbawinata, MA
    Lühr, BG
    Westerhaus, M
    [J]. EARLY WARNING SYSTEMS FOR NATURAL DISASTER REDUCTION, 2000, : 527 - 532
  • [50] Risk Assessment of a Wind Turbine Using an AHP-MABAC Approach with Grey System Theory: A Case Study of Morocco
    Bakhat, Rim
    Rajaa, Mohammed
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020 : 1DUMMMY