共 50 条
- [41] A Two-phase Method based on Markov and TOPSIS for Evaluating Project Risk Management Strategies 2015 27TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2015, : 1994 - 1998
- [43] Research on the Application of Analytic Hierarchy Process Method in Occupational Health Risk Management INNOVATIVE THEORIES AND METHODS FOR RISK ANALYSIS AND CRISIS RESPONSE, 2012, 21 : 444 - 448
- [44] Using TOPSIS Method with Interval Number to Assess Air Quality for 16th Asian Olympic Games 2010 4TH INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING (ICBBE 2010), 2010,
- [45] USING COGNITIVE MAPPING AS A METHOD TO SYSTEMATICALLY ASSESS PERSPECTIVES IN FISHERIES MANAGEMENT GULF AND CARIBBEAN RESEARCH, 2019, 30 (01): : GCFI1 - GCFI7
- [46] An Urban Traffic Risk Assessment Using TOPSIS Method Based on Driving and Road Information CICTP 2021: ADVANCED TRANSPORTATION, ENHANCED CONNECTION, 2021, : 1245 - 1254
- [48] Risk Analysis of Occupational Accidents and Occupational Diseases Using the JS']JSA (Job Safety Analysis) Method 2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
- [50] Occupational Risk Management Method for Quarry Blasting Operations Based on Modified FMECA Algorithm INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2023, (01): : 241 - 249