共 50 条
- [33] Risk Assessment for Electricity Generation Management Process with SWARA Based Fuzzy TOPSIS Method JOURNAL OF POLYTECHNIC-POLITEKNIK DERGISI, 2024, 27 (01):
- [34] Developing TOPSIS method using statistical normalization for selecting Knowledge management strategies JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2013, 6 (04): : 860 - 875
- [35] Uncertain Inventory Management Using TOPSIS and FAHP Method in Automotive Supply Chain 2020 IEEE 7TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA 2020), 2020, : 441 - 446
- [36] Distribution Network Service Restoration Interval Number Group Decision-Making Using Grey TOPSIS Method PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 453 - 464
- [38] The Occupational Risk Assessment Method: A Tool to Improve Organizational Resilience in the Context of Occupational Health and Safety Management ADVANCES IN SAFETY MANAGEMENT AND HUMAN FACTORS, 2020, 969 : 367 - 376
- [40] Ranking of strategic management indicators in improvement of urban management by using multiple attribute decision method of TOPSIS ARCHITECTURE AND BUILDING MATERIALS, PTS 1 AND 2, 2011, 99-100 : 524 - +