Model Research of Multi-Objective and Resource-Constrained Project Scheduling Problem

被引:2
|
作者
Zhou, Rong [1 ]
Ye, Chun-ming [1 ]
Ma, Hui-min [2 ]
机构
[1] Univ Shanghai Sci & Technol, Sch Management, Shanghai, Peoples R China
[2] Shanghai Elect Coll, Shanghai, Peoples R China
关键词
Chaos particle swarm optimization; Dimensionless; Dynamic weighting methods; Multi-objective; Project scheduling;
D O I
10.1007/978-3-642-38427-1_104
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Keeping the time, cost, quality and resources in balance is the key factor to building the general objective in the engineering project scheduling, which is related to the success or failure of the whole project. The paper first establishes time, expenses, resources and quality objective functions, and then builds comprehensive optimization model by dimensionless and dynamic weighting methods. At last, the paper applies the model into real project case and uses chaos particle swarm optimization to solve the problem. Through the real application example, the article proves that this comprehensive optimization model combining with chaos particle swarm optimization algorithm can solve the multi-objective optimization problems more accurately and rapidly, which gain the ideal effect on construction period cut, cost reduction, quality improvement and resources balance.
引用
收藏
页码:991 / 1001
页数:11
相关论文
共 50 条
  • [41] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    [J]. Journal of Scheduling, 2019, 22 : 211 - 237
  • [42] Integration of routing into a resource-constrained project scheduling problem
    Lacomme, Philippe
    Moukrim, Aziz
    Quilliot, Alain
    Vinot, Marina
    [J]. EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 421 - 464
  • [43] Memetic algorithm for the resource-constrained project scheduling problem
    Chen, Di
    Liu, Shixin
    Qin, Shujin
    [J]. 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 4991 - 4996
  • [44] Resource-Constrained Project Scheduling Problem with Modified PSO
    Zhang, Kai
    Jiang, Jing
    Zhao, Guo-rong
    [J]. ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 6: MODELLING & SIMULATION INDUSTRIAL ENGINEERING & MANAGEMENT, 2010, : 308 - 311
  • [45] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [46] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [47] Bi-objective optimization of a multi-mode, multi-site resource-constrained project scheduling problem
    Hessami, Shiba
    Davari-Ardakani, Hamed
    Javid, Youness
    Ameli, Mariam
    [J]. JOURNAL OF MODELLING IN MANAGEMENT, 2024, 19 (04) : 1136 - 1154
  • [48] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    [J]. SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [49] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    [J]. AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [50] On the summary measures for the resource-constrained project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    Coelho, Jose
    [J]. ANNALS OF OPERATIONS RESEARCH, 2024, 337 (02) : 593 - 625