A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy

被引:39
|
作者
Qiu Dishan [1 ]
He Chuan [1 ]
Liu Jin [1 ]
Ma Manhao [1 ]
机构
[1] Natl Univ Def Technol, Sci & Technol Informat Syst Engn Lab, Changsha 410073, Hunan, Peoples R China
来源
关键词
ALGORITHMS;
D O I
10.1155/2013/304047
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Collision debris increases risk to Earth-observing satellites
    Brumfiel, Geoff
    [J]. NATURE, 2009, 458 (7240) : 814 - 814
  • [2] Flexible Scheduling for an Agile Earth-Observing Satelllite
    Maillard, Adrien
    [J]. PROCEEDINGS OF THE TWENTY-FOURTH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE (IJCAI), 2015, : 4379 - 4380
  • [3] Collision debris increases risk to Earth-observing satellites
    Geoff Brumfiel
    [J]. Nature, 2009, 458 : 814 - 814
  • [4] Scheduling an Agile Multipayload Earth-Observing Satellite
    Zhang, Wenyuan
    Zheng, Gangtie
    [J]. JOURNAL OF SPACECRAFT AND ROCKETS, 2024, 61 (01) : 143 - 156
  • [5] A Maximum Independent Set Method for Scheduling Earth-Observing Satellite Constellations
    Eddy, Duncan
    Kochenderfer, Mykel J.
    [J]. JOURNAL OF SPACECRAFT AND ROCKETS, 2021, 58 (05) : 1416 - 1429
  • [6] Adaptable Data Download Schedules for Agile Earth-Observing Satellites
    Maillard, A.
    Verfaillie, G.
    Pralet, C.
    Jaubert, J.
    Sebbag, I.
    Fontanari, F.
    Lhermitte, J.
    [J]. JOURNAL OF AEROSPACE INFORMATION SYSTEMS, 2016, 13 (08): : 280 - 300
  • [7] Planning and scheduling of Earth Observing Satellites
    Kaslow, David
    [J]. 2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4356 - 4367
  • [8] Optimization-Based Scheduling Method for Agile Earth-Observing Satellite Constellation
    Cho, Doo-Hyun
    Kim, Jun-Hong
    Choi, Han-Lim
    Ahn, Jaemyung
    [J]. JOURNAL OF AEROSPACE INFORMATION SYSTEMS, 2018, 15 (11): : 611 - 626
  • [9] Heuristics for scheduling Earth observing satellites
    Wolfe, WJ
    Sorensen, SE
    [J]. EARTH OBSERVING SYSTEMS IV, 1999, 3750 : 328 - 339
  • [10] Agent-Based Dynamic Scheduling for Earth-Observing Tasks on Multiple Airships in Emergency
    Zhu, Xiaomin
    Sim, Kwang Mong
    Jiang, Jianqing
    Wang, Jianjiang
    Chen, Chao
    Liu, Zhong
    [J]. IEEE SYSTEMS JOURNAL, 2016, 10 (02): : 661 - 672