Optimization-Based Scheduling Method for Agile Earth-Observing Satellite Constellation

被引:47
|
作者
Cho, Doo-Hyun [1 ]
Kim, Jun-Hong [1 ]
Choi, Han-Lim [1 ]
Ahn, Jaemyung [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Aerosp Engn, Daejeon 34141, South Korea
来源
基金
新加坡国家研究基金会;
关键词
WEIGHTED COMPLETION-TIME; SINGLE-MACHINE; RELEASE DATES; BOUND ALGORITHM; TARDINESS; MULTISATELLITE; SYSTEMS; BRANCH; ORBIT;
D O I
10.2514/1.I010620
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
This Paper proposes a two-step binary linear programming formulation for task scheduling of a constellation of low-Earth-orbit satellites and demonstrates its applicability and scalability to obtain high-quality solutions using a standard mixed-integer linear programming solver. In this instance, the goal of satellite constellation task scheduling is to allocate each task for the satellites and to determine the task starting times in order to maximize the overall mission performance metric. The scheduling problem is formulated to find the solution by first finding a set of candidate communication time intervals for each satellite/ground-station pair as one of the key constraints and time tabling the observation task to acquire the user-requested data, with the incorporation of key constraints for satellite constellation operation. Numerical experiments are designed for investigating the trends, sensitivity, and characteristics of scheduling outputs based on multiple representative instances. The performance of the scheduling solutions by the proposed two-step binary linear programming method exhibits significant improvement of up to 35% in the number of assignments and the sum of profits over the general greedy algorithm.
引用
收藏
页码:611 / 626
页数:16
相关论文
共 50 条
  • [1] Scheduling an Agile Multipayload Earth-Observing Satellite
    Zhang, Wenyuan
    Zheng, Gangtie
    [J]. JOURNAL OF SPACECRAFT AND ROCKETS, 2024, 61 (01) : 143 - 156
  • [2] Reinforcement Learning for the Agile Earth-Observing Satellite Scheduling Problem
    Herrmann, Adam
    Schaub, Hanspeter
    [J]. IEEE TRANSACTIONS ON AEROSPACE AND ELECTRONIC SYSTEMS, 2023, 59 (05) : 5235 - 5247
  • [3] Flexible Scheduling for an Agile Earth-Observing Satelllite
    Maillard, Adrien
    [J]. PROCEEDINGS OF THE TWENTY-FOURTH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE (IJCAI), 2015, : 4379 - 4380
  • [4] Application of agile Earth-observing satellite in disaster monitoring
    Sun Kai
    Chen Yingwu
    Wang Pei
    He Renjie
    [J]. RESEARCH JOURNAL OF CHEMISTRY AND ENVIRONMENT, 2012, 16 : 56 - 61
  • [5] A Maximum Independent Set Method for Scheduling Earth-Observing Satellite Constellations
    Eddy, Duncan
    Kochenderfer, Mykel J.
    [J]. JOURNAL OF SPACECRAFT AND ROCKETS, 2021, 58 (05) : 1416 - 1429
  • [6] FEASIBILITY OF AUTONOMOUS DECISION MAKING ON BOARD AN AGILE EARTH-OBSERVING SATELLITE
    Beaumet, Gregory
    Verfaillie, Gerard
    Charmeau, Marie-Claire
    [J]. COMPUTATIONAL INTELLIGENCE, 2011, 27 (01) : 123 - 139
  • [7] ATTITUDE MANEUVER STRATEGY OF AGILE EARTH OBSERVING SATELLITE CONSTELLATION
    Wang, Xinwei
    Tang, Zhongxing
    Shu, Leizheng
    Han, Chao
    [J]. SPACEFLIGHT MECHANICS 2015, PTS I-III, 2015, 155 : 2295 - 2306
  • [8] Mission Planning and Action Planning for Agile Earth-Observing Satellite with Genetic Algorithm
    Kai Sun
    Zheng-Yu Yang
    Pei Wang
    Ying-Wu Chen
    [J]. Journal of Harbin Institute of Technology(New series), 2013, (05) : 51 - 56
  • [9] Estimation of the minimal duration of an attitude change for an autonomous agile earth-observing satellite
    Beaumet, Gregory
    Verfaillie, Gerard
    Charmeau, Marie-Claire
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING - CP 2007, 2007, 4741 : 3 - +
  • [10] Earth-Observing Satellite Makes It Into Orbit
    不详
    [J]. SCIENCE, 2011, 334 (6056) : 575 - 575