共 50 条
- [1] Heuristics for scheduling Earth observing satellites [J]. EARTH OBSERVING SYSTEMS IV, 1999, 3750 : 328 - 339
- [2] A comparison of techniques for scheduling Earth observing satellites [J]. PROCEEDING OF THE NINETEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND THE SIXTEENTH CONFERENCE ON INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2004, : 836 - 843
- [3] An approach for pre-scheduling of earth observing satellites [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3079 - 3084
- [4] A scenario based optimal scheduling algorithm for earth observing satellites [J]. Chung Cheng Ling Hsueh Pao/Journal of Chung Cheng Institute of Technology, 2013, 42 (01): : 129 - 140
- [5] The application of evolutionary computation in Earth Observing Satellites scheduling problem [J]. PROCEEDINGS OF THE 11TH JOINT INTERNATIONAL COMPUTER CONFERENCE, 2005, : 383 - 386
- [6] A heuristic method for Earth Observing Satellites united imaging scheduling [J]. Yuhang Xuebao/Journal of Astronautics, 2009, 30 (02): : 652 - 658
- [7] a Comparison of Heuristic Methods for Scheduling Earth Observing Satellites Fleet [J]. ITCS: 2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, PROCEEDINGS, VOL 2, PROCEEDINGS, 2009, : 164 - +
- [8] Model and algorithm to mission planning of agile earth observing satellites [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (05): : 1035 - 1040
- [9] A comparison of iterative repair strategies for earth observing satellites imaging scheduling [J]. PROCEEDINGS OF NINTH ACIS INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, ARTIFICIAL INTELLIGENCE, NETWORKING AND PARALLEL/DISTRIBUTED COMPUTING, 2008, : 93 - 98
- [10] A comparison of iterative repair strategies for earth observing satellites imaging scheduling [J]. Yuhang Xuebao/Journal of Astronautics, 2009, 30 (03): : 1255 - 1260