共 50 条
- [1] The Model, Algorithm and Application to Scheduling Problem of Agile Earth Observing Satellites [J]. DISASTER ADVANCES, 2012, 5 (04): : 1341 - 1345
- [2] Planning and scheduling of Earth Observing Satellites [J]. 2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4356 - 4367
- [3] Heuristics for scheduling Earth observing satellites [J]. EARTH OBSERVING SYSTEMS IV, 1999, 3750 : 328 - 339
- [4] Study on heuristic algorithm for dynamic scheduling problem of Earth Observing Satellites [J]. SNPD 2007: EIGHTH ACIS INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, ARTIFICIAL INTELLIGENCE, NETWORKING, AND PARALLEL/DISTRIBUTED COMPUTING, VOL 1, PROCEEDINGS, 2007, : 9 - +
- [5] A comparison of techniques for scheduling Earth observing satellites [J]. PROCEEDING OF THE NINETEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND THE SIXTEENTH CONFERENCE ON INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2004, : 836 - 843
- [6] An approach for pre-scheduling of earth observing satellites [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13E : 3079 - 3084
- [7] A Model, a Heuristic and a Decision Support System to Solve the Earth Observing Satellites Fleet Scheduling Problem [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 256 - +
- [8] A scenario based optimal scheduling algorithm for earth observing satellites [J]. Chung Cheng Ling Hsueh Pao/Journal of Chung Cheng Institute of Technology, 2013, 42 (01): : 129 - 140
- [9] A heuristic method for Earth Observing Satellites united imaging scheduling [J]. Yuhang Xuebao/Journal of Astronautics, 2009, 30 (02): : 652 - 658
- [10] a Comparison of Heuristic Methods for Scheduling Earth Observing Satellites Fleet [J]. ITCS: 2009 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND COMPUTER SCIENCE, PROCEEDINGS, VOL 2, PROCEEDINGS, 2009, : 164 - +