共 50 条
- [41] Applying Fuzzy Logic to Estimate Setup Times in Sequence Dependent Single Machine Scheduling Problems INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2007, 7 (01): : 111 - 118
- [42] Single-machine scheduling with sequence dependent setup to minimize total weighted squared tardiness IIE Transactions (Institute of Industrial Engineers), 1999, 31 (02): : 113 - 124
- [46] Optimization Scheduling of Power System Based on Improved Particle Swarm Optimization 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 945 - 951
- [48] Single machine group scheduling with resources dependent setup time Dianji yu Kongzhi Xuebao, 2007, 1 (70-73+78):
- [50] Single machine group scheduling with resource dependent setup times Xi Tong Cheng Yu Dian Zi Ji Shu/Syst Eng Electron, 2007, 6 (938-941):