An Improved Particle Swarm Optimization for Selective Single Machine Scheduling with Sequence Dependent Setup Costs and Downstream Demands

被引:2
|
作者
Li, Kun [1 ]
Tian, Huixin [2 ]
机构
[1] Tianjin Polytech Univ, Sch Management, Tianjin 300387, Peoples R China
[2] Tianjin Polytech Univ, Sch Elect Engn & Automat, Tianjin 300387, Peoples R China
基金
中国国家自然科学基金;
关键词
WEIGHTED TARDINESS; HEURISTIC ALGORITHM; SEARCH ALGORITHM; MINIMIZE;
D O I
10.1155/2015/687968
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates a special single machine scheduling problem derived from practical industries, namely, the selective single machine scheduling with sequence dependent setup costs and downstream demands. Different from traditional single machine scheduling, this problem further takes into account the selection of jobs and the demands of downstream lines. This problem is formulated as a mixed integer linear programming model and an improved particle swarm optimization (PSO) is proposed to solve it. To enhance the exploitation ability of the PSO, an adaptive neighborhood search with different search depth is developed based on the decision characteristics of the problem. To improve the search diversity and make the proposed PSO algorithm capable of getting out of local optimum, an elite solution pool is introduced into the PSO. Computational results based on extensive test instances show that the proposed PSO can obtain optimal solutions for small size problems and outperform the CPLEX and some other powerful algorithms for large size problems.
引用
收藏
页数:11
相关论文
共 50 条
  • [21] Scheduling with past-sequence-dependent setup times and learning effects on a single machine
    Xue-Ru Wang
    Ji-Bo Wang
    Wen-Jun Gao
    Xue Huang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 739 - 746
  • [22] Single machine scheduling problems with sequence-dependent setup times and precedence delays
    Lin, Shih-Wei
    Ying, Kuo-Ching
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [23] Single-machine scheduling problems with past-sequence-dependent setup times
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1045 - 1049
  • [24] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine
    H. M. Soroush
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2483 - 2487
  • [25] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Yiyo Kuo
    Sheng-I Chen
    Yen-Hung Yeh
    Operational Research, 2020, 20 : 927 - 942
  • [26] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine
    Soroush, H. M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 2483 - 2487
  • [27] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Kuo, Yiyo
    Chen, Sheng-, I
    Yeh, Yen-Hung
    OPERATIONAL RESEARCH, 2020, 20 (02) : 927 - 942
  • [28] A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs
    Shim, Ik-Soo
    Kim, Hyeok-Chol
    Doh, Hyoung-Ho
    Lee, Dong-Ho
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 920 - 929
  • [29] Elucidating multiprocessors flow shop scheduling with dependent setup times using a twin particle swarm optimization
    Yu, Shun-Chi
    APPLIED SOFT COMPUTING, 2014, 21 : 578 - 589
  • [30] Improved Particle Swarm Optimization for RCP Scheduling Problem
    Wang, Qiang
    Qi, Jianxun
    SIXTH INTERNATIONAL SYMPOSIUM ON NEURAL NETWORKS (ISNN 2009), 2009, 56 : 49 - 57