Preliminary Discussion on Construction Land of Flood Control Projects on the Lower Yellow River

被引:0
|
作者
Tan Hao [1 ]
Bao Ruchao [1 ]
Pan Mingqiang [1 ]
机构
[1] Yellow River Engineer Consulting Co Ltd, Zhengzhou 450003, Peoples R China
关键词
the Yellow River; problem of construction land; engineering construction; flood Control of the Lower Yellow River;
D O I
暂无
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Projects of reinforcing embankments by depositing and waterproof wall are mainly used on the Lower Yellow River. In this paper, the important effects of these measures in eliminating hidden danger of embankments, flood-fighting and improving eco-environment are analyzed. Through comparing these measures, it has a conclusion that reinforcing embankments by depositing takes an important role, and then the management mode of land expropriation and its important effects are discussed. Under the situation that land managements at the national and local increased and farmer' arable lands reduced, the land expropriation management mode about flood control constructions need innovating and improving. Departing from the requirements of the national land policy, economic and social development on the lower reaches of the Yellow River, the new land expropriation management mode is put forward that warping works are part of the flood control projects. In order to ensure the security of flood control projects, the manage department of the Yellow River expropriate the permanent occupation land of the projects of reinforcing embankments by depositing, at the same time, the silt body land also be used for farming. In the process of land expropriation, the farmers are paid fee of construction land compensation for agricultural production. The new land management mode is that, the water conservancy infrastructure is invested by the national, and the farmers acquire incomes from planting and the manage department of the Yellow River manage the construction land. The crop growth conditions on the lower reaches of the Yellow River, the reclamation design of silt body land, the tillage soil thickness and the soil composition are discussed in the paper. For the sake of long term farming in silt body land to farmers, reasonable invest and feasible management mode are analyzed. This paper puts forward the opinion of management.
引用
收藏
页码:134 / 138
页数:5
相关论文
共 50 条
  • [21] Construction Risk Analysis of the Yellow River Flood Control Project Based on Probability
    Zhao Yu
    Zhao Zhenguo
    Li He
    Guo Xifang
    Zhang Jianwei
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 330 - +
  • [22] FLOOD CHARACTERISTICS AND DESIGN FLOOD FOR FLOOD PROTECTION IN LOWER YELLOW-RIVER
    SHI, FC
    WANG, G
    [J]. TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 407 - 423
  • [23] Flood Routing Characteristics and Flood Control Situation in the Lower Yellow River since Xiaolangdi Reservoir Operation
    Wan Qiang
    Jiang Enhui
    Zhang Linzhong
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL YELLOW RIVER FORUM ON ENSURING WATER RIGHT OF THE RIVER'S DEMAND AND HEALTHY RIVER BASIN MAINTENANCE, VOL III, 2015, : 341 - 344
  • [24] FLOOD FORECASTING AND FLOOD WARNING SYSTEM IN THE LOWER YELLOW-RIVER
    CHEN, ZT
    [J]. TAMING THE YELLOW RIVER : SILT AND FLOODS, 1989, 13 : 425 - 449
  • [25] FLOOD AND RIVER SEDIMENTATION PROBLEMS OF THE LOWER YELLOW RIVER IN CHINA.
    Qian Ning
    Zhang Ren
    [J]. Irrigation and Power, 1982, 39 (02): : 205 - 215
  • [26] Discussion on the Reversibility of the River Channel Shrinking in the Lower Yellow River
    Yao Wenyi
    Zhang Huaxing
    Hou Zhijun
    Ji Handa
    [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL YELLOW RIVER FORUM ON KEEPING HEALTHY LIFE OF THE RIVER, VOL IV, 2005, : 189 - 196
  • [27] The Application of Asphalt Cold Recycling Technology in Lower Yellow River Flood Control Project
    Zhao, Yu Kun
    Li, Qing An
    [J]. 2016 INTERNATIONAL CONFERENCE ON ELECTRONIC, INFORMATION AND COMPUTER ENGINEERING, 2016, 44
  • [28] Countermeasures for the Yellow River Ice Flood Control
    Xiang, Teng
    [J]. PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL I, 2010, : 341 - 345
  • [29] CONTROL OF PROJECTS DURING CONSTRUCTION - DISCUSSION
    NEALE, DE
    FRANCIS, HWA
    BARBER, JN
    BELL, R
    PURVES, D
    SHILSTON, AW
    NORMAN, A
    CRANSTON, WB
    TOBIN, G
    SVEHLA, K
    DUFFY, PJ
    THOMAS, RD
    NINOS, GE
    WEARNE, SH
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 : 859 - 869
  • [30] LOWER RIVER MOLE FLOOD ALLEVIATION SCHEME - DISCUSSION
    HOCKIN, DL
    FOSTER, WE
    HARRIS, WB
    GRUFFYDD, B
    POSTLES, NH
    FAWDRY, TMR
    HAMILTON, WAH
    WINDERS, JD
    HOYLES, S
    KENN, MJ
    PEPPER, AT
    BULMAN, RB
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1989, 86 : 423 - 434