The Calculation Method Research for Transportation Capacity Release Value of Existing Line after High-speed Railway's Operation

被引:0
|
作者
Zhang Luyu [1 ]
Feng Xiaoyan [1 ]
机构
[1] Hangzhou Wanxiang Polytech, Appl Engn Dept, Hangzhou, Zhejiang, Peoples R China
关键词
High speed railway; Transport capacity; Release Value; Removal coefficient calculation;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the high-speed railway put into operation, the types of trains in the existed line is reduced, train intervals will also be shortened. We analyze the impact of high-speed rail's operations on the basis of the calculation method of the interval passing capacity in existed line, for example in three major areas : the difference of train running time in the section, the proportion of trains dispatched in succession, the change of train tracking interval. From the definition of the removal coefficient calculation, we calculate the existing railway single line and double line transport capacity after release.
引用
收藏
页码:174 / 177
页数:4
相关论文
共 50 条
  • [31] The Affection on Urban Network Structure after High-Speed Railway in Operation in Guangxi
    Gan, Fuzhi
    [J]. PROCEEDINGS OF THE 2018 INTERNATIONAL WORKSHOP ON EDUCATION REFORM AND SOCIAL SCIENCES (ERSS 2018), 2018, 300 : 426 - 430
  • [32] Analysis of integrated efficiency and operation method of high-speed railway transport system
    Piao, AH
    Hu, AZ
    [J]. THEORIES AND APPLICATIONS OF TRAFFIC AND TRANSPORTATION SYSTEMS ENGINEERING, 1996, : 305 - 313
  • [33] Knowledge extraction method for operation and maintenance texts of high-speed railway turnout
    Lin, Haixiang
    Bai, Wansheng
    Zhao, Zhengxiang
    Hu, Nana
    Li, Dong
    Lu, Renjie
    [J]. Journal of Railway Science and Engineering, 2024, 21 (07) : 2569 - 2580
  • [34] Research on Transportation Theory and Solution with Regular Service at High-speed Railway Terminal Stations
    Yan Y.
    Wang B.
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2017, 39 (05): : 7 - 14
  • [35] Maturity Model and Evaluation Method of High-Speed Railway Operation Safety Management
    Li K.
    Zhang Y.
    Guo J.
    Song H.
    [J]. Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (05): : 138 - 144
  • [36] Satisfaction Research of High-speed Railway Transportation Basing on Fuzzy Hierarchy Comprehensive Evaluation
    Hu, Fang
    Zhao, Shan-Lin
    [J]. 2015 INTERNATIONAL CONFERENCE ON ENVIRONMENT, MANUFACTURING INDUSTRY AND ECONOMIC DEVELOPMENT, (EMIED 2015), 2015, : 24 - 29
  • [37] Calculation method for carbon dioxide emission in the life cycle of high-speed railway
    School of Traffic and Transportation Engineering, Central South University, Changsha Hunan 410075, China
    不详
    不详
    [J]. Zhongguo Tiedao Kexue, 2013, 5 (140-144):
  • [38] Scheduling Method for Integrated Plan of Train Operation and Shunting Operation in High-speed Railway Station
    Zhong M.-X.
    Yue Y.-X.
    Zhou L.-S.
    [J]. Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2021, 21 (03): : 176 - 186
  • [39] Research on Optimizing Method of High Speed Railway Passing Capacity Utilization
    Naranbaatar, S.
    Jiang, Jian
    [J]. 2020 5TH INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, ENERGY TECHNOLOGY AND ENVIRONMENTAL ENGINEERING, 2020, 571
  • [40] A COMPARATIVE EARTHWORK AND COST ANALYSIS OF IMPROVING AN EXISTING RAILWAY LINE AND CONSTRUCTING A NEW HIGH-SPEED LINE IN TURKEY
    Gumus, K. A.
    Gulal, V. E.
    [J]. 3RD INTERNATIONAL GEOADVANCES WORKSHOP, 2016, 42-2 (W1): : 13 - 18