Knowledge extraction method for operation and maintenance texts of high-speed railway turnout

被引:0
|
作者
Lin, Haixiang [1 ]
Bai, Wansheng [1 ]
Zhao, Zhengxiang [1 ]
Hu, Nana [1 ]
Li, Dong [1 ]
Lu, Renjie [2 ]
机构
[1] School of Automation and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou,730070, China
[2] CASCO Signal Ltd., Shanghai,200071, China
关键词
D O I
10.19713/j.cnki.43-1423/u.T20231577
中图分类号
学科分类号
摘要
24
引用
收藏
页码:2569 / 2580
相关论文
共 50 条
  • [1] Construction and Application of Knowledge Graph for Troubleshooting of High-speed Railway Turnout Equipment
    Lin, Haixiang
    Zhao, Zhengxiang
    Lu, Ran
    Bai, Wansheng
    Hu, Nana
    Lu, Renjie
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2024, 46 (07): : 73 - 80
  • [2] Key technologies in high-speed railway turnout design
    Wang P.
    Chen R.
    Chen X.
    [J]. Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2010, 45 (01): : 28 - 33
  • [3] Control method for insufficient displacement of switch rail in high-speed railway turnout
    Wang, Pu
    Zeng, Rui-Dong
    Wang, Shu-Guo
    [J]. Jiaotong Yunshu Gongcheng Xuebao/Journal of Traffic and Transportation Engineering, 2022, 22 (02): : 87 - 98
  • [4] Research on Knowledge Extraction Method for High-speed Railway Signal Equipment Fault Based on Text
    Li X.
    Shi T.
    Li P.
    Dai M.
    Zhang X.
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2021, 43 (03): : 92 - 100
  • [5] Research on BIM Application in High-Speed Railway OSC Operation Maintenance Management
    Meng, Fei
    Shi, Tianyun
    Liu, Beisheng
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON ELECTRICAL AND INFORMATION TECHNOLOGIES FOR RAIL TRANSPORTATION (EITRT) 2017: TRANSPORTATION, 2018, 483 : 853 - 860
  • [6] Operation and Maintenance of High-speed Railway Signaling System: Hierarchical Structure Model
    Lin P.
    Tian Y.
    Yuan Z.-M.
    Zhang Q.
    Dong H.-R.
    Song H.-F.
    Yang C.-H.
    [J]. Zidonghua Xuebao/Acta Automatica Sinica, 2022, 48 (01): : 152 - 161
  • [7] Chinese Turnout Crack Monitoring System of High-speed Railway
    Wang, Ping
    Xiao, Jieling
    Sheng, Xi
    Qin, Dayong
    [J]. STRUCTURAL HEALTH MONITORING 2015: SYSTEM RELIABILITY FOR VERIFICATION AND IMPLEMENTATION, VOLS. 1 AND 2, 2015, : 2046 - 2053
  • [8] Research and application of method for retesting CPIII control network during operation and maintenance stages of high-speed railway
    Ren, Xiao-Chun
    Zhou, Dong-Wei
    [J]. Journal of Railway Engineering Society, 2013, 30 (02) : 25 - 29
  • [9] REASONABLE STIFFNESS VALUE OF BALLASTLESS TRACK TURNOUT IN HIGH-SPEED RAILWAY
    Chen, Rong
    Wang, Ping
    Quan, Shunxi
    [J]. KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 318 - 323
  • [10] Influence of Conversion Deviation on Dynamic Performance of High-speed Railway Turnout
    Chen Rong
    Wang Ping
    Wei Xian-kui
    [J]. ADVANCED MATERIALS AND COMPUTER SCIENCE, PTS 1-3, 2011, 474-476 : 1599 - 1604