共 50 条
- [32] Hibernia GBS - The construction process [J]. PROCEEDINGS OF THE SIXTH (1996) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL I, 1996, 1996, : 12 - 19
- [34] A multiplier adjustment algorithm for a truck scheduling and transshipment problem at a cross-docking terminal [J]. Soft Computing, 2023, 27 : 4169 - 4193
- [35] Solving an Integrated Bi-objective Container Terminal Integrated Planning with Transshipment Operations [J]. METAHEURISTICS, MIC 2024, PT II, 2024, 14754 : 380 - 386
- [36] MONITORING AND MANAGEMENT SYSTEM OF MOORING OPERATIONS WITHIN ENGINEERING OPERATION PROCEDURE OF A TRANSSHIPMENT TERMINAL AT AN OFF-SHORE PART OF THE TERMINAL [J]. MARINE INTELLECTUAL TECHNOLOGIES, 2018, 2 (04): : 104 - 114
- [38] Hibernia will emphasize electronic documentation [J]. OIL & GAS JOURNAL, 1997, 95 (18) : 115 - 116
- [40] The Hibernia gravity base structure [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1, 1998, : 654 - 659