Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach

被引:8
|
作者
Rahman, Ismail Abdul [1 ]
Al-Emad, Nashwan [2 ]
Nagapan, Sasitharan [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil & Environm Engn, Parit Raja Batu Pahat 86400, Johor, Malaysia
[2] Sariya Contracting Co Ltd, Novotel Business Pk,Tower 2,3rd Floor, Al Khobar 31952, Saudi Arabia
关键词
D O I
10.1051/matecconf/20168107001
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
This paper presents the development of PLS-SEM Path Model of delay factors of Saudi Arabia construction industry focussing on Mecca City. The model was developed and assessed using SmartPLS v3.0 software and it consists of 37 factors/manifests in 7 groups/independent variables and one dependent variable which is delay of the construction projects. The model was rigorously assessed at measurement and structural components and the outcomes found that the model has achieved the required threshold values. At structural level of the model, among the seven groups, the client and consultant group has the highest impact on construction delay with path coefficient (3-value of 0.452 and the project management and contract administration group is having the least impact to the construction delay with (3-value of 0.016. The overall model has moderate explaining power ability with R-2 value of 0.197 for Saudi Arabia construction industry representation. This model will able to assist practitioners in Mecca city to pay more attention in risk analysis for potential construction delay.
引用
收藏
页数:5
相关论文
共 50 条
  • [21] Factors influencing career sustainability in Saudi Arabian banks: A PLS-SEM analysis
    Parveen, Musrrat
    Alshehri, Amal Awadh Hadi
    [J]. E & M EKONOMIE A MANAGEMENT, 2024, 27 (03): : 154 - 171
  • [22] Modelling the WELL building concepts for office environments: PLS-SEM approach
    Tan, Carmen Y. M.
    Rahman, Rahimi A.
    Lee, Yong Siang
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023,
  • [23] Rationalizing the Implementation of Web-Based Project Management Systems in Construction Projects Using PLS-SEM
    Doloi, Hemanta
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
  • [24] Exploring the Sustainable Delivery of Building Projects in Developing Countries: A PLS-SEM Approach
    Kineber, Ahmed Farouk
    Hamed, Mohammed Magdy
    [J]. SUSTAINABILITY, 2022, 14 (22)
  • [25] Factors affecting the Social Networks Acceptance: An Empirical Study using PLS-SEM Approach
    Alshurideh, Muhammad
    Salloum, Said A.
    Al Kurdi, Barween
    Al-Emran, Mostafa
    [J]. 2019 8TH INTERNATIONAL CONFERENCE ON SOFTWARE AND COMPUTER APPLICATIONS (ICSCA 2019), 2019, : 414 - 418
  • [26] Linking employee loyalty with job satisfaction using PLS-SEM modelling
    Dhir, Swati
    Dutta, Tanusree
    Ghosh, Piyali
    [J]. PERSONNEL REVIEW, 2020, 49 (08) : 1695 - 1711
  • [27] Determinants of Patient Satisfaction in Healthcare Industry in Delhi using PLS-SEM
    Bansal, Neha
    Narwal, Mahabir
    Prinkle, Prinkle
    [J]. JOURNAL OF HEALTH MANAGEMENT, 2024,
  • [28] Forensic Analysis of the Disputes Typology of the NSW Construction Industry Using PLS-SEM and Prospective Trend Analysis
    Rahnamayiezekavat, Payam
    Sorooshnia, Ehsan
    Rashidi, Maria
    Faraji, Amir
    Mostafa, Sherif
    Moon, Sungkon
    [J]. BUILDINGS, 2022, 12 (10)
  • [29] The Structural of Effective Materials Management Factors Model: A PLS-SEM Approach
    Jusoh, Zairra Mat
    Kasim, Narimah
    Dodo, Mansir
    [J]. INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2021, 12 (01): : 110 - 119
  • [30] Assessment of interorganisational conflict in building refurbishment projects using EFA and PLS-SEM
    Noori, Adel
    [J]. ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2023, 15 (01): : 178 - 191