Assessment of interorganisational conflict in building refurbishment projects using EFA and PLS-SEM

被引:0
|
作者
Noori, Adel [1 ]
机构
[1] Liming Vocat Univ, Sch Architecture & Civil Engn, Quanzhou 362046, Fujian, Peoples R China
关键词
interorganisational conflict; building refurbishment projects; uncertainty; structural equation modelling; partial least squares; exploratory factor analysis; CONSTRUCTION PROJECTS; UNCERTAINTY; CONTRACTORS; INFORMATION; SELECTION;
D O I
10.2478/otmcj-2023-0013
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
It is generally known that building refurbishment (BR) projects are more likely to face uncertainties than new building projects. Therefore, uncertainty is an element that may cause interorganisational conflict (IOC). This paper presents a study with three objectives: to evaluate the uncertainty levels, assess the IOC that may arise due to the uncertain nature of BR projects and examine the interrelated dependence relationship between uncertainty and IOC variables. A total of 188 refurbishment projects formed the database for this study. The study applied Exploratory Factor Analysis (EFA) and Structural Equation Modelling (SEM) based on Partial Least Squares (PLS) in the data analysis process. The findings show that uncertainty and IOC BR projects are moderate. Additionally, the uncertainty variable has a positive relationship with the IOC variable; in other words, the higher the uncertainty, the higher is the level of IOC. However, the three factors that emerged as being predictably more uncertain are inadequate space for storage of material and working, difficulty in access to the site and unclear scope of the work.
引用
收藏
页码:178 / 191
页数:14
相关论文
共 50 条
  • [1] Exploring the Sustainable Delivery of Building Projects in Developing Countries: A PLS-SEM Approach
    Kineber, Ahmed Farouk
    Hamed, Mohammed Magdy
    [J]. SUSTAINABILITY, 2022, 14 (22)
  • [2] Perceived destination competitiveness: An empirical assessment using PLS-SEM
    Zainuddin, Z.
    Radzi, S. M.
    Zahari, M. S. M.
    Ong, M. H. A.
    [J]. HERITAGE, CULTURE AND SOCIETY: RESEARCH AGENDA AND BEST PRACTICES IN THE HOSPITALITY AND TOURISM INDUSTRY, 2016, : 377 - 381
  • [3] Building Information Modelling Implementation Model for Sustainable Building Projects in Developing Countries: A PLS-SEM Approach
    Abdel-Tawab, Maged
    Kineber, Ahmed Farouk
    Chileshe, Nicholas
    Abanda, Henry
    Ali, Ali Hassan
    Almukhtar, Avar
    [J]. SUSTAINABILITY, 2023, 15 (12)
  • [4] Predictive model assessment in PLS-SEM: guidelines for using PLSpredict
    Shmueli, Galit
    Sarstedt, Marko
    Hair, Joseph F.
    Cheah, Jun-Hwa
    Ting, Hiram
    Vaithilingam, Santha
    Ringle, Christian M.
    [J]. EUROPEAN JOURNAL OF MARKETING, 2019, 53 (11) : 2322 - 2347
  • [5] Cost Deviation Model of Construction Projects in Saudi Arabia Using PLS-SEM
    Alsugair, Abdullah M.
    [J]. SUSTAINABILITY, 2022, 14 (24)
  • [6] Modelling the WELL building concepts for office environments: PLS-SEM approach
    Tan, Carmen Y. M.
    Rahman, Rahimi A.
    Lee, Yong Siang
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023,
  • [7] An updated and expanded assessment of PLS-SEM in information systems research
    Hair, Joe
    Hollingsworth, Carole L.
    Randolph, Adriane B.
    Chong, Alain Yee Loong
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2017, 117 (03) : 442 - 458
  • [8] Studying the relationship between causes and effects of poor communication in construction projects using PLS-SEM approach
    Gamiljj, Yaser
    Abd Rahman, Ismail
    [J]. JOURNAL OF FACILITIES MANAGEMENT, 2023, 21 (01) : 102 - 148
  • [9] Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach
    Rahman, Ismail Abdul
    Al-Emad, Nashwan
    Nagapan, Sasitharan
    [J]. 2016 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION AND TRAFFIC ENGINEERING (ICTTE 2016), 2016, 81
  • [10] Rationalizing the Implementation of Web-Based Project Management Systems in Construction Projects Using PLS-SEM
    Doloi, Hemanta
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)