Study on the BT Financing Model of Non-business Public Building in the Post-disaster Reconstruction - Case Study of GuangYuan

被引:0
|
作者
Liu Hongyong [1 ]
Deng Li [1 ]
机构
[1] Southwest Petr Univ, Sch Civil & Architecture, Chengdu 610500, Sichuan, Peoples R China
关键词
Non-business public building; post-disaster reconstruction; BT financing mode;
D O I
暂无
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
Wenchuan earthquake caused great damage to Sichuan Province, the post-disaster reconstruction faced tremendous financial pressure. Taking Guangyuan as an example, through investigating the construction financing source of non-business public building, analysing the conditions of BT financing model which was used to the non-business public building construction, and then put forward that after the three years rebuilding period, the non-business public building construction could adopt BT financing mode. Drawing the diagram of non-profit public buildings BT project financing mode, and analysing the advantages and disadvantages of BT financing mode which was used to the non-profit public building, and got that BT financing model used to the non-business public building could alleviate the government post-disaster reconstruction pressure, and the project investors could also obtain good returns.
引用
收藏
页码:349 / 352
页数:4
相关论文
共 50 条
  • [1] Study on Financing Mode of Transport Infrastructure During Post-Disaster Reconstruction
    Liu, Huijun
    Li, Huimin
    He, Jie
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 573 - 576
  • [2] A Sustainability-based Building Material Manufacturing Project for Post-disaster Reconstruction: a Case Study
    He, Weiyi
    Yin, Yilin
    Zhong, Wei
    [J]. MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 1009 - 1012
  • [3] Post-disaster housing reconstruction as a significant opportunity to building disaster resilience: a case in Vietnam
    Tuan Anh Tran
    [J]. NATURAL HAZARDS, 2015, 79 (01) : 61 - 79
  • [4] Post-disaster housing reconstruction as a significant opportunity to building disaster resilience: a case in Vietnam
    Tuan Anh Tran
    [J]. Natural Hazards, 2015, 79 : 61 - 79
  • [5] Resourcing for post-disaster reconstruction: a comparative study of Indonesia and China
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. DISASTER PREVENTION AND MANAGEMENT, 2012, 21 (01) : 7 - 21
  • [6] Post-disaster reconstruction supply chain: Empirical optimization study
    Zokaee, Mahsa
    Tavakkoli-Moghaddam, Reza
    Rahimi, Yaser
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 129
  • [7] Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China
    Chang, Yan
    Wilkinson, Suzanne
    Potangaroa, Regan
    Seville, Erica
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (01) : 37 - 48
  • [8] A Comprehensive Assessment of Buildings for Post-Disaster Sustainable Reconstruction: A Case Study of Beirut Port
    El Hage, Josiana
    Shahrour, Isam
    Chehade, Fadi Hage
    Abi Farraj, Faten
    [J]. SUSTAINABILITY, 2023, 15 (18)
  • [9] Evolution of post-disaster reconstruction policy framework in Sri Lanka: A longitudinal case study
    Siriwardhana, Senuri Disara
    Kulatunga, Udayangani
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2023, 85
  • [10] GIS-Enabled Resilience Strategies for Post-Disaster Reconstruction: A Case Study of Pakistan
    Kumar, Danish
    Zhang, Chengyi
    Kamran, Muhammad
    Cakir, Sevilay Demirkesen
    [J]. COMPUTING IN CIVIL ENGINEERING 2023-RESILIENCE, SAFETY, AND SUSTAINABILITY, 2024, : 44 - 51