摘要
Ten years ago, risk-informed regulation was proclaimed by many to be the future of regulatory activity. The three options for using risk in the regulatory arena had been defined in SECY-98-300 and efforts were initiated to develop the first regulatory changes. However, regulatory change has been slow. The revised 50.44 rule, which was supposed to be non-controversial, was not finalized until September of 2003, five years after it was started. The new 50.69 rule, which embodied the STP graded quality assurance principles, was not finalized until November of 2004 and the Pressurized Water Reactor Owners Group (PWROG) pilot plant application is still under review by the Nuclear Regulatory Commission (NRC). The 50.46a rule change, admittedly a very difficult and controversial undertaking, is still not finalized. On the other hand, the NRC has increased the use of plant risk insights and results the Significance Determination Process (SDP) and the Mitigating System Performance Index (MSPI). While the industry has been working on the major regulatory initatives described above, they have also successfully initiated a significant number of risk-informed programs within the existing regulations. Significant among these industry efforts are the risk-informed changes to the Technical Specifications and the risk-informed changes to in service inspection and in-service testing. One bright spot on the horizon is the use of NFPA-805, which uses fire risk insights, as an alternative to the Appendix R requirements for fire protection. The industry and the NRC are working together to develop an acceptable methodology for implementing this alternative. The increasing requirements for scope and quality of the probabilistic risk assessments (PRAs) that are used as the basis for many risk-informed activities has resulted in a major slow-down in licensee implementation of new risk-informed activites. The publication of industry consensus standards is resulting in significant resource expenditures to upgrade the scope and quality of the PRAs. Once the scope and quality of the plant-specific PRAs is completed, there should again be significant implementation of risk-informed applications. In summary, risk-informed regulation has already produced significant increases in safety and has potentially reduced licensee regulatory burdens. However, the promise of risk-informed changes to regulations is still an unfilfilled expectation and will likely remain so in the near future. Once the scope and quality of PRAs is upgraded to satisfy the industry consensus standards, there should be renewed activity in implenting risk-informed programs.
引用
收藏
页码:1035 / 1043
页数:9
相关论文
共 50 条
  • [31] Risk-informed licensing for advanced reactors
    Durán, FA
    Camp, AL
    Golay, M
    Apostolakis, G
    Price, LL
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1449 - 1454
  • [32] Risk-Informed Transit Project Oversight
    Sillars, David N.
    O'Connor, Michael B.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2009, 25 (03) : 106 - 114
  • [33] The nuclear industry's transition to risk-informed regulation and operation in the United States
    Kadak, Andrew C.
    Matsuo, Toshihiro
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2007, 92 (05) : 609 - 618
  • [34] PRA research and the development of risk-informed regulation at the US nuclear regulatory commission
    Siu, Nathan
    Collins, Dorothy
    [J]. NUCLEAR ENGINEERING AND TECHNOLOGY, 2008, 40 (05) : 349 - 364
  • [35] Improving risk-based regulatory processes: identifying measures to pursue risk-informed regulation
    Naime, Andre
    Andrey, Jean
    [J]. JOURNAL OF RISK RESEARCH, 2013, 16 (09) : 1141 - 1161
  • [36] A risk-informed methodology for parts selection and management
    Jackson, M
    Sandborn, P
    Pecht, M
    Hemens-Davis, C
    Audette, P
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 1999, 15 (04) : 261 - 271
  • [37] Should the Model for Risk-Informed Regulation be Game Theory Rather than Decision Theory?
    Bier, Vicki M.
    Lin, Shi-Woei
    [J]. RISK ANALYSIS, 2013, 33 (02) : 281 - 291
  • [38] Risk-Informed Performance Assessment of Construction Projects
    Papanikolaou, Merkourios
    Xenidis, Yiannis
    [J]. SUSTAINABILITY, 2020, 12 (13)
  • [39] PSA completeness in risk-informed decision making
    Richner, M
    Zimmermann, S
    Rao, S
    Stetkar, J
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 1805 - 1810
  • [40] Collision risk-informed weather routing for sailboats
    Zyczkowski, Marcin
    Szlapczynski, Rafal
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 232