Solving the Continuous Berth Allocation and Specific Quay Crane Assignment Problems with Quay Crane Coverage Range

被引:29
|
作者
Li, Feng [1 ]
Sheu, Jiuh-Biing [2 ]
Gao, Zi-You [3 ]
机构
[1] Beijing Jiaotong Univ, State Key Lab Rail Traff Control & Safety, Beijing 100044, Peoples R China
[2] Natl Taiwan Univ, Dept Business Adm, Taipei 10617, Taiwan
[3] Beijing Jiaotong Univ, Beijing 100044, Peoples R China
基金
中国国家自然科学基金;
关键词
continuous berth allocation; quay crane assignment; coverage range; vessel cluster; spatiotemporal conflict analysis; SCHEDULING PROBLEM; CONTAINER TERMINALS; HEURISTICS; ALGORITHM; SEARCH; MODELS;
D O I
10.1287/trsc.2015.0619
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This work solves an integrated model of the continuous berth allocation and specific quay crane (QC) assignment problem with QC coverage range. Based on the analysis of vessel berth position and QC coverage range, a nonlinear mixed-integer programming model is developed. A novel heuristic method based on spatiotemporal conflict analysis is applied to derive a high-quality berth-QCs plan. The initial pessimistic priorities of vessels are employed to reflect the preferences of vessels for terminal resources. The proposed cluster of vessels focuses on spatiotemporal conflicts among vessels. Coordinated assignments of resources for the clustered vessels are realized via the branch-and-bound method. The QC feasibility check identifies infeasibility of QCs-to-vessel assignment. Several experiments are conducted to validate the effectiveness of the proposed method. Numerical results demonstrate that high-quality berth-QCs plans can be obtained within an acceptable time. Further, the influence of coverage range of QC is discussed in detail.
引用
收藏
页码:968 / 989
页数:22
相关论文
共 50 条
  • [21] A fast approach for the integrated berth allocation and quay crane assignment problem
    Ma, H. L.
    Chan, Felix T. S.
    Chung, S. H.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 (11) : 2076 - 2087
  • [22] Integrated berth allocation and quay crane assignment with uncertain maintenance activities
    Li, Ying
    Chu, Feng
    Zheng, Feifeng
    Kacem, Imed
    [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 248 - 253
  • [23] The simultaneous berth and quay crane allocation problem
    Imai, Akio
    Chen, Hsieh Chia
    Nishimura, Etsuko
    Papadimitriou, Stratos
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2008, 44 (05) : 900 - 920
  • [24] The Berth Allocation and Quay Crane Assignment Problem Using a CP Approach
    Zampelli, Stephane
    Vergados, Yannis
    Van Schaeren, Rowan
    Dullaert, Wout
    Raa, Birger
    [J]. PRINCIPLES AND PRACTICE OF CONSTRAINT PROGRAMMING, CP 2013, 2013, 8124 : 880 - 896
  • [25] An enriched model for the integrated berth allocation and quay crane assignment problem
    Raa, Birger
    Dullaert, Wout
    Van Schaeren, Rowan
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (11) : 14136 - 14147
  • [26] An Exact Algorithm for the Integrated Planning of Berth Allocation and Quay Crane Assignment
    Vacca, Ilaria
    Salani, Matteo
    Bierlaire, Michel
    [J]. TRANSPORTATION SCIENCE, 2013, 47 (02) : 148 - 161
  • [27] A Proactive-Reactive-Based Approach for Continuous Berth Allocation and Quay Crane Assignment Problems with Hybrid Uncertainty
    Wang, Zhu
    Cheng, Junfeng
    Hu, Hongtao
    [J]. JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (01)
  • [28] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [29] Exact and heuristic methods for the integrated berth allocation and specific time-invariant quay crane assignment problems
    Cheimanoff, Nicolas
    Fontane, Frederic
    Kitri, Mohamed Nour
    Tchernev, Nikolay
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2022, 141
  • [30] A New Genetic Algorithm for Continuous Berth and Quay Crane Allocation Problem
    Li, Na
    Jin, Zhihong
    Massami, Erick
    [J]. ADVANCED TRANSPORTATION, PTS 1 AND 2, 2011, 97-98 : 619 - 622