The Berth Allocation and Quay Crane Assignment Problem Using a CP Approach

被引:0
|
作者
Zampelli, Stephane [1 ]
Vergados, Yannis [2 ]
Van Schaeren, Rowan [3 ]
Dullaert, Wout [4 ,5 ]
Raa, Birger [3 ,6 ]
机构
[1] Dynam Decis Technol, Providence, RI 02902 USA
[2] Brown Univ, Providence, RI 02912 USA
[3] Antwerp Maritime Acad, Antwerp, Belgium
[4] Free Univ Amsterdam, Dept Informat & Logist & Innovat, NL-1081 HV Amsterdam, Netherlands
[5] Univ Antwerp, Inst Transport & Maritime Management Antwerp, Antwerp, Belgium
[6] Univ Ghent, B-9000 Ghent, Belgium
关键词
berth allocation; crane assignment; containers; terminal; constraint programming; SCHEDULING PROBLEM; CONTAINER TERMINALS;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This paper considers the combination of berth and crane allocation problems in container terminals. We propose a novel approach based on constraint programming which is able to model many realistic operational constraints. The costs for berth allocation, crane allocation, time windows, breaks and transition times during gang movements are optimized simultaneously. The model is based on a resource view where gangs are consumed by vessel activities. Side constraints are added independently around this core model. The model is richer than the state of the art in the operations research community. Experiments show that the model produces solutions with a cost gap of 1/10 (7,8%) to 1/5 (18,8%) compared to an ideal operational setting where operational constraints are ignored.
引用
收藏
页码:880 / 896
页数:17
相关论文
共 50 条
  • [1] A quay crane assignment approach for berth allocation problem in container terminal
    Hu, Zhi-Hua
    [J]. 2010 THIRD INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY AND SECURITY INFORMATICS (IITSI 2010), 2010, : 17 - 21
  • [2] A fast approach for the integrated berth allocation and quay crane assignment problem
    Ma, H. L.
    Chan, Felix T. S.
    Chung, S. H.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2015, 229 (11) : 2076 - 2087
  • [3] A robust optimization approach to the integrated berth allocation and quay crane assignment problem
    Shang, Xiao Ting
    Cao, Jin Xin
    Ren, Jie
    [J]. TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 94 : 44 - 65
  • [4] Robust Scheduling for Berth Allocation and Quay Crane Assignment Problem
    Rodriguez-Molins, M.
    Salido, M. A.
    Barber, F.
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [5] Functional integration approach for the berth allocation, quay crane assignment and specific quay crane assignment problems
    Karam, A.
    Eltawil, A. B.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 102 : 458 - 466
  • [6] A Hybrid GA with Variable Quay Crane Assignment for Solving Berth Allocation Problem and Quay Crane Assignment Problem Simultaneously
    Hsu, Hsien-Pin
    Chiang, Tai-Lin
    Wang, Chia-Nan
    Fu, Hsin-Pin
    Chou, Chien-Chang
    [J]. SUSTAINABILITY, 2019, 11 (07)
  • [7] The berth allocation and quay crane assignment problem with crane travel and setup times
    Correcher, Juan F.
    Perea, Federico
    Alvarez-Valdes, Ramon
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2024, 162
  • [8] An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal
    Yang, Chunxia
    Wang, Xiaojun
    Li, Zhenfeng
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 243 - 253
  • [9] Robust optimization for the integrated berth allocation and quay crane assignment problem
    Wang, Chong
    Miao, Lixin
    Zhang, Canrong
    Wu, Tao
    Liang, Zhe
    [J]. NAVAL RESEARCH LOGISTICS, 2024, 71 (03) : 452 - 476
  • [10] The Integrated Rescheduling Problem of Berth Allocation and Quay Crane Assignment with Uncertainty
    Zheng, Hongxing
    Wang, Zhaoyang
    Liu, Hong
    [J]. PROCESSES, 2023, 11 (02)