Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects

被引:0
|
作者
McGrath, T. C. [1 ]
Roberds, W. J.
Keizur, A. E.
del Olmo, A. Gutierrez [2 ]
Barbato, I. [2 ]
机构
[1] Golder Associates Inc, Redmond, WA 98052 USA
[2] Golder Associates Global Iber SL, Madrid, Spain
来源
SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3 | 2006年
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Historically, engineers and planners worldwide have not adequately estimated the ultimate costs and schedules for infrastructure projects, with unidentified biases and problems sometimes causing large budget and schedule overruns. Many government agencies now recognize these issues and require probabilistic risk assessment and risk management for large projects to better estimate and control cost and schedule. Others have attempted to address these problems, but many of these attempts have significant limitations (e.g., no direct link between cost and schedule). This paper briefly describes an innovative and cost-effective approach for cost and schedule risk assessment/management and its application to a large tunnel project and a large bridge project. The approach helps mitigate historical estimating and budgeting problems by: (1) quantifying uncertainty in ultimate actual project cost and schedule within a probabilistic, risk-based, integrated cost and schedule model, in which the uncertainties in inputs are explicitly de-biased and assessed (through elicitation of technical experts) and incorporated; (2) identifying and prioritizing critical cost and schedule risks and opportunities, as well as quantifying the costs and benefits of proposed mitigation strategies to address critical risks/opportunities; and (3) improving communication and decision-making (including funding requirements).
引用
收藏
页码:2093 / +
页数:2
相关论文
共 50 条
  • [41] A Probabilistic Software Risk Assessment and Estimation Model for Software Projects
    Kumar, Chandan
    Yadav, Dilip Kumar
    ELEVENTH INTERNATIONAL CONFERENCE ON COMMUNICATION NETWORKS, ICCN 2015/INDIA ELEVENTH INTERNATIONAL CONFERENCE ON DATA MINING AND WAREHOUSING, ICDMW 2015/NDIA ELEVENTH INTERNATIONAL CONFERENCE ON IMAGE AND SIGNAL PROCESSING, ICISP 2015, 2015, 54 : 353 - 361
  • [42] Impacts of change management on risk and cost management of a construction projects
    Halou, Mohamed Ibrahim Khalifa
    Samin, Razali
    Ahmad, Mushtaq
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 157 - 164
  • [43] Lifecycle risk management methods for controlling risk factors of underground infrastructure and tunneling projects
    Gyoergy, P.
    Fogarasi, I. S.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 99 - 103
  • [44] A Schedule Risk Assessment Model of Construction Projects Based on Bayesian Network
    Liu Zheng
    Ma Guofeng
    PROCEEDINGS OF THE 2011 INTERNATIONAL CONFERENCE ON ENGINEERING AND RISK MANAGEMENT, 2011, : 106 - 111
  • [45] Probabilistic Risk Assessment of the Rice Cropping Schedule for Central Hokkaido, Japan
    Nemoto, Manabu
    Hamasaki, Takahiro
    Sameshima, Ryoji
    Kumagai, Etsushi
    Ohno, Hiroyuki
    Wakiyama, Yasuyuki
    Maruyama, Atsushi
    Goto, Shinkichi
    Ozawa, Kiyoshi
    JOURNAL OF APPLIED METEOROLOGY AND CLIMATOLOGY, 2012, 51 (07) : 1253 - 1264
  • [46] Risk assessment and management of water conservancy projects
    Ge, Wei
    FRONTIERS IN EARTH SCIENCE, 2023, 11
  • [47] APPLICATION OF PROBABILISTIC RISK ASSESSMENT TECHNIQUES IN JAPAN
    SATO, K
    CONRADI, LL
    YOUNG, J
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 32 (JUN): : 463 - 463
  • [48] Risk evaluation of schedule and cost for projects based on Monte-Carlo simulation
    Chen, Jun-fei
    Chen, Zhi-song
    DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES A-MATHEMATICAL ANALYSIS, 2006, 13 : 1215 - 1218
  • [49] Probabilistic risk assessment: A practical & cost effective approach
    Lee, Lydia Lam
    Ingegneri, Antonino J.
    Li, Ming
    Everett, David F.
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2007 PROCEEDINGS, 2006, : 147 - +
  • [50] Modeling cost escalation in large infrastructure projects
    Touran, Ali
    Lopez, Ramon
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08): : 853 - 860