共 50 条
- [41] Development of Expert System for Concurrent Product Design and Planning for Assembly [J]. The International Journal of Advanced Manufacturing Technology, 1999, 15 : 153 - 162
- [42] EFFECTS OF PRODUCT STRUCTURE ON PLANNING OF WORK ON AN EQUIPMENT ASSEMBLY LINE [J]. WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1978, 68 (03): : 133 - 136
- [44] Development of expert system for concurrent product design and planning for assembly [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1999, 15 (03): : 153 - 162
- [46] Planning and constructing work schedules that account for unit and product assembly [J]. Automation and Remote Control, 2014, 75 : 373 - 381