Constraint ratio in product assembly planning

被引:1
|
作者
Fan, IS
Liu, CK
机构
[1] CIM Institute, Cranfield University, Cranfield, Bedfordshire
[2] CIM Institute, Bldg. 53, Cranfield University, Cranfield
关键词
assembly planning; constraint ratio; precedence constraints; precedence graph;
D O I
10.1007/BF01179034
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly planning considers the product, process, and production system. The existence of constraints makes the assembly planning process difficult and time consuming. The planning degree of freedom (PDOF) for designers will be increased If the number of constraints is decreased on either the product or the other sides. A higher PDOF means that companies can be more flexible in responding rapidly to the assembly of parts. In this paper, a constraint ratio (C-R) has been defined to measure the influence of the product constraints on assembly planning. Some rules have been established to simplify the evaluation procedures of the constraint ratio of the product. Examples are illustrated and explained.
引用
收藏
页码:401 / 406
页数:6
相关论文
共 50 条
  • [21] Virtual assembly planning and assembly-oriented quantitative evaluation of product assemblability
    Wei Gao
    Xiaodong Shao
    Huanling Liu
    [J]. The International Journal of Advanced Manufacturing Technology, 2014, 71 : 483 - 496
  • [22] Virtual assembly planning and assembly-oriented quantitative evaluation of product assemblability
    Gao, Wei
    Shao, Xiaodong
    Liu, Huanling
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 71 (1-4): : 483 - 496
  • [23] A product data management integrated product configuration and assembly process planning environment
    Gao, JX
    Bowland, NW
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2002, 216 (03) : 407 - 418
  • [24] Two kinds of degree of freedom in constraint state and their application to assembly planning
    Yu, Y
    Yokokohji, Y
    Yoshikawa, T
    [J]. 1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 1993 - 1999
  • [25] An optimal policy for supply planning of assembly systems with service level constraint
    Ould-Louly, MA
    Dolgui, A
    [J]. SIMULATION IN INDUSTRY 2001, 2001, : 250 - 254
  • [26] A problem design and constraint modelling approach for collaborative assembly line planning
    Neumann, Daniel
    Keidel, Jan
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2019, 55 : 199 - 207
  • [27] Computer aided assembly planning generation: An approach method of based constraint
    Zhang, GX
    Sun, JA
    Qin, Y
    Li, MC
    Zheng, DT
    [J]. ADVANCED DESIGN AND MANUFACTURE IN THE GLOBAL MANUFACTURING ERA, VOL 2, 1997, : 558 - 563
  • [28] Research and development on constraint-based product family design and assembly simulation
    Jiang, ZH
    Yan, JQ
    [J]. JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 139 (1-3) : 257 - 262
  • [29] Concurrent engineering environment for product design, assembly and resource planning
    Delchambre, A
    Fan, IS
    Wafflard, A
    Falkenauer, E
    [J]. FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING 1996, 1996, : 322 - 331
  • [30] A PRODUCT ASSEMBLY AND RESTORATION PLANNING SYSTEM FOR ECOLOGICALLY CONSCIOUS FACTORIES
    WONG, S
    FU, JC
    TROY, CA
    [J]. INFORMATION INFRASTRUCTURE SYSTEMS FOR MANUFACTURING, 1993, 14 : 319 - 329