共 50 条
- [1] Project Risk Evaluation Based on Triangle Fuzzy Number and TOPSIS [J]. ADVANCES IN BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING, 2008, 5 : 382 - +
- [3] Algorithm Research on Project Risk Fuzzy Evaluation [J]. FIRST INTERNATIONAL WORKSHOP ON DATABASE TECHNOLOGY AND APPLICATIONS, PROCEEDINGS, 2009, : 160 - +
- [4] An Approach in BOT Project Selection Based on Fuzzy QFD and TOPSIS with Consideration of Risk [J]. 2011 PROCEEDINGS OF THE 3RD CONFERENCE ON THERMAL POWER PLANTS (CTPP), 2011,
- [7] Research on risk evaluation for venture capital based on intuitionistic fuzzy set and TOPSIS [J]. PROCEEDINGS OF THE FIRST INTERNATIONAL SYMPOSIUM ON DATA, PRIVACY, AND E-COMMERCE, 2007, : 415 - 417
- [8] RISK EVALUATION OF TUNNELLING PROJECTS BY FUZZY TOPSIS [J]. INTERNATIONAL CONFERENCE ON MANAGEMENT (ICM 2011), 2011, : 1219 - 1232
- [9] Risk Evaluation Research on A-FUZZY-based Management by Project [J]. 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10585 - +
- [10] A Fuzzy TOPSIS Approach for Medical Provider Selection and Evaluation [J]. 2012 INTERNATIONAL CONFERENCE ON FUZZY THEORY AND ITS APPLICATIONS (IFUZZY2012), 2012, : 322 - 326