共 50 条
- [21] Phosphorus removal mechanisms in constructed wetland under stochastic intermittent inflow [J]. Tumu Jianzhu yu Huanjing Gongcheng/Journal of Civil, Architectural and Environmental Engineering, 2012, 34 (04): : 105 - 110
- [22] Constructed wetland nitrogen and phosphorus removal at a rural campground and conference center [J]. ON-SITE WASTEWATER TREATMENT, PROCEEDINGS, 2001, : 684 - 691
- [26] Application of Pilot-Scale-Constructed Wetland as Tertiary Treatment System of Wastewater for Phosphorus and Nitrogen Removal [J]. WATER AIR AND SOIL POLLUTION, 2011, 218 (1-4): : 131 - 143
- [28] Application of Pilot-Scale-Constructed Wetland as Tertiary Treatment System of Wastewater for Phosphorus and Nitrogen Removal [J]. Water, Air, & Soil Pollution, 2011, 218 : 131 - 143