共 50 条
- [1] Nitrogen Removal in Constructed Wetland Wastewater Treatment System: a Review [J]. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON ASIAN-EUROPEAN ENVIRONMENTAL TECHNOLOGY AND KNOWLEDGE TRANSFER, 2008, : 335 - 338
- [2] Effect of recirculation on nitrogen removal in a hybrid constructed wetland system [J]. ECOLOGICAL ENGINEERING, 2012, 40 : 1 - 5
- [3] Advance of Nitrogen Removal in Constructed Wetland [J]. 5TH ANNUAL INTERNATIONAL CONFERENCE ON MATERIAL SCIENCE AND ENVIRONMENTAL ENGINEERING (MSEE2017), 2018, 301
- [4] Nitrogen removal in constructed wetland systems [J]. ENGINEERING IN LIFE SCIENCES, 2009, 9 (01): : 11 - 22
- [5] Treatment of wastewater with different ratios of carbon to nitrogen using an enhanced nitrogen removal system of constructed wetland [J]. ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 864-867 : 1287 - +
- [7] Application of Pilot-Scale-Constructed Wetland as Tertiary Treatment System of Wastewater for Phosphorus and Nitrogen Removal [J]. WATER AIR AND SOIL POLLUTION, 2011, 218 (1-4): : 131 - 143
- [8] Application of Pilot-Scale-Constructed Wetland as Tertiary Treatment System of Wastewater for Phosphorus and Nitrogen Removal [J]. Water, Air, & Soil Pollution, 2011, 218 : 131 - 143
- [10] Long-Term Trends in Nitrogen Removal by an Aridland Constructed Treatment Wetland [J]. Wetlands, 2020, 40 : 2071 - 2083