Dam-Break Flood Risk Assessment on Laiyang City

被引:0
|
作者
Li, Changzhi [1 ]
Chi, Zhixue [2 ]
Yang, Yongfeng [2 ]
Rao, Zhengfu [3 ]
Cope, Mike [3 ]
机构
[1] China Inst Water Resources & Hydropower Res, Beijing 100038, Peoples R China
[2] Dept Water Resources, Jinan 250013, Shandong, Peoples R China
[3] Halcrow China Ltd, Kowloon, Hong Kong, Peoples R China
关键词
Dam-Break Flood; Risk Assessment; Laiyang City; Strategy;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Laiyang, one of the most important cities in east Shandong province, has experiencing a rapid urbanization and economic development in the last decade. It means a great deal to the flood security for this city to practice integrated flood management at river basin level, moreover, flood risk assessment is the baseline for flood management. Muyu Reservoir, located 9 km northeast of the urban area of Laiyang City, is the most important structural measure for flood management and has significant impact on the flood features at this city. The focus of this study was on the risk assessment of dam-break flood from Muyu Reservoir to Laiyang City. The dam-break flood is one of the catastrophic disasters to the urban area of Laiyang City. The dam-break analysis was performed by numeric simulation according to the following four steps. First, it was analyzed on the reasons for possible dam-break flood's occurrence. Simply speaking, extreme flood, earthquake, and terrorist attack are likely to result in dam-break flood. Second, a simulation on the typical reason, namely the extreme hydrological event, of dam-break flood was implemented. The key information considered in this simulation includes the water level at the dam (the check flood water level), the inflow to the reservoir (the check flood hydrograph), and two typical structural scenarios (with/without-levees) in the lower reach of the reservoir. Third, based on flood simulations, flood hazard analysis was conducted and the results indicated that the peak discharge would be over 40,000 m(3)/s at the breach and over 22,000m(3)/s near Laiyang City area; most of the urban area would be flooded; the duration from the beginning of dam-break to the arrival of peak discharge at Laiyang City is less than half an hour. Finally, a plan for integrated dam-break flood management was presented for the purpose of dam-break flood disaster mitigation, both available structural and nonstructural measures were proposed according to the situations in the river basin, the main strategic advises include flood emergency planning, flood risk mapping, flood monitoring and early warning system construction, reservoir regulation, and flood risk public awareness.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Analysis of the dam overtopping failure fuzzy risk under consideration of the upstream dam-break flood
    Zhang R.
    Zhang S.
    Wang B.
    Wang H.
    Shuili Xuebao/Journal of Hydraulic Engineering, 2016, 47 (04): : 509 - 517
  • [22] Numerical Simulation and Risk Assessment of Cascade Reservoir Dam-Break
    Hu, Liangming
    Yang, Xu
    Li, Qian
    Li, Shuyu
    WATER, 2020, 12 (06)
  • [23] Dam-break flow through an idealised city
    Soares-Frazao, Sandra
    Zech, Yves
    JOURNAL OF HYDRAULIC RESEARCH, 2008, 46 (05) : 648 - 658
  • [24] A fuzzy framework for risk analysis of dam-break flood in climate change scenarios
    Goel, Anubhav
    Srinivas, V. V.
    INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2025, 119
  • [25] Simulation of the St. Francis dam-break flood
    Begnudelli, Lorenzo
    Sanders, Brett F.
    JOURNAL OF ENGINEERING MECHANICS-ASCE, 2007, 133 (11): : 1200 - 1212
  • [26] LABORATORY VERIFICATION OF A DAM-BREAK FLOOD MODEL - DISCUSSION
    KATOPODES, ND
    SCHAMBER, DR
    JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1981, 107 (02): : 246 - 249
  • [27] DIMENSIONLESS SOLUTION OF DAM-BREAK FLOOD WAVES - CLOSURE
    SAKKAS, JG
    STRELKOFF, T
    JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1977, 103 (08): : 932 - 933
  • [28] LABORATORY VERIFICATION OF A DAM-BREAK FLOOD MODEL - CLOSURE
    CHEN, CL
    JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1982, 108 (02): : 275 - 283
  • [29] DAM-BREAK FLOOD IN A PRISMATIC DRY CHANNEL - DISCUSSION
    MARTENS, IC
    JOURNAL OF THE HYDRAULICS DIVISION-ASCE, 1974, 100 (NHY10): : 1501 - 1502
  • [30] Research on assessment model of tailing reservoir dam-break risk classification
    Wei, Yong
    Xu, Kai-Li
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2013, 34 (SUPPL.1): : 118 - 121