A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

被引:12
|
作者
Shou, Yongyi [1 ]
Xiang, Wenwen [1 ]
Li, Ying [1 ]
Yao, Weijian [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou 310058, Zhejiang, Peoples R China
基金
中国国家自然科学基金;
关键词
GENETIC ALGORITHM; ALLOCATION; OPTIMIZATION;
D O I
10.1155/2014/302684
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent's energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resourceconstrained project portfolio selection and scheduling problem.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [22] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [23] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [24] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [25] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [26] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
  • [27] Evolutionary algorithm for resource-constrained project scheduling and multiple execution modes
    Lopez, Oscar C.
    Barcia, Ricardo M.
    Eyada, Osama
    Gauthier, Fernando O.
    Lecture Notes in Artificial Intelligence (Subseries of Lecture Notes in Computer Science), 1996, 1159
  • [28] An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2019, 12 (01) : 91 - 119
  • [29] A hybrid evolutionary algorithm for the resource constrained project scheduling problem
    Thammano, Arit
    Phu-ang, Ajchara
    PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL SYMPOSIUM ON ARTIFICIAL LIFE AND ROBOTICS (AROB 17TH '12), 2012, : 834 - 837
  • [30] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774