UNCERTAINTY ANALYSIS OF SB-LOCA IN AP1000 NUCLEAR POWER PLANT

被引:0
|
作者
Shi, Hao [1 ]
Cai, Qi [1 ]
Chen, Yuqing [1 ]
Jiang, Lizhi [1 ]
机构
[1] Naval Univ Engn, Wuhan, Hubei, Peoples R China
关键词
TOLERANCE LIMITS;
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Best estimate plus uncertainty methods (BEPUs) could be used to eliminate the over-conservatism and gain more safety margin in the analysis of thermal-hydraulic transient process at nuclear power plant. Based on the Best estimate thermal hydraulic system code RELAP5/MOD3.2 platform, the best estimate plus uncertainty methods (BEPUs) proposed by GRS (Gesellschaft fur Anlagen- and Reaktorsicherheit) are presented together with applications to a small break loss of coolant accident (SB-LOCA) on the AP1000 Nuclear Power Plant best estimate analysis model. According to the results of uncertainty calculations, the dispersion bands of maximum cladding temperature and the core outlet void fraction are displayed and assessed.
引用
收藏
页数:8
相关论文
共 50 条
  • [21] AP1000 PLANT TYPICAL OPERATIONAL TRANSIENT ANALYSIS
    Liu Lixin
    Zheng Limin
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 1, 2014,
  • [22] Development of rapid atmospheric source term estimation system for AP1000 nuclear power plant
    Zhao, Yunfei
    Zhang, Liguo
    Tong, Jiejuan
    [J]. PROGRESS IN NUCLEAR ENERGY, 2015, 81 : 264 - 275
  • [23] The effect of temperature variation on PCCS functional failure probability for AP1000 nuclear power plant
    Liu, Guanyu
    Feng, Wanxin
    Wang, Shaohui
    Yu, Yu
    Niu, Fenglei
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2024, 426
  • [24] New nuclear options - The AP1000
    Kasper, Ken
    [J]. HEALTH PHYSICS, 2006, 90 (06): : 519 - 520
  • [25] The Summary and Research on Nuclear Island Construction and Erection Cost Management of AP1000 Nuclear Power Plant Project
    Yan, Zhaoyong
    [J]. PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 941 - 953
  • [26] Simulation and analysis on 10-in. cold leg small break LOCA for AP1000
    Yang, J.
    Wang, W. W.
    Qiu, S. Z.
    Tian, W. X.
    Su, G. H.
    Wu, Y. W.
    [J]. ANNALS OF NUCLEAR ENERGY, 2012, 46 : 81 - 89
  • [27] AP1000 Accident Analysis of Small and Medium LOCA Coupled With Failure of half Depressurization
    Zhao Guozhi
    Cao Xinrong
    [J]. 2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [28] Lifting Operation Safety Management in AP1000 Nuclear Plant Project
    He Xiaogang
    Shortes, Shell
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
  • [29] Study on HSE Management system of AP1000 Nuclear Plant Project
    He Xiaogang
    Fang Xiaopeng
    Wei Zhong
    Yang Yanli
    Sun Zhiyou
    [J]. PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 2, 2011, : 385 - 390
  • [30] THE ACC CONFIGURATION SENSITIVITY STUDY FOR AP1000 LARGE BREAK LOCA
    Yu Jianhui
    [J]. PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 4, 2014,