METHODOLOGY FOR ENHANCING RELIABILITY OF PREDICTIVE PROJECT SCHEDULES IN CONSTRUCTION

被引:17
|
作者
Jaskowski, Piotr [1 ]
机构
[1] Lublin Univ Technol, Fac Civil Engn & Architecture, PL-20816 Lublin, Poland
关键词
project programme reliability; construction project scheduling; construction and maintenance of built facilities; robustness; duration risk analysis and assessment; time buffer allocation; MANAGEMENT; RISK; STRATEGIES; STABILITY; MODEL;
D O I
10.17531/ein.2015.3.20
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction projects consist in providing new built facilities as well as in maintaining the existing building stock. Reliability engineering in construction encompasses all stages of the structure's life cycle from the earliest concept of the project to decommissioning. The project planning and design stages are aimed at selecting or creating technical and organisational solutions to assure that the built facility meets the sponsor's and the user's requirements; these requirements regulate also the construction process. The result of planning the construction process should be a reliable schedule - immune to disruptive effects of random occurrences, so assuring high probability of the actual processes meeting their predefined deadlines. A practical method of scheduling construction projects should enable the planner to generate schedules resistant to random occurrences, making them reliable so that the users can meet deadlines. The paper presents a proactive methodology for generating construction schedules of enhanced reliability. The methodology covers two fundamental stages. The first stage is a construction duration risk assessment based on a multi-attribute evaluation of operating conditions. The second stage is the allocation of time buffers. An original methodology supporting decisions at each stage is put forward, namely a methodology for evaluating process duration risk level, defining significance of operating conditions, estimating dispersion of process durations, and defining criticality of processes in the schedule. The author proposes a set of measures of schedule robustness to serve as surrogate criteria in the schedule instability cost minimization problem and buffer sizing. The proposed way of allowing for risk and uncertainty in creating reliable schedules is argued to be efficient in protecting the project completion date, as well as stage or even process start dates, against disruptions.
引用
收藏
页码:470 / 479
页数:10
相关论文
共 50 条
  • [31] Development of a methodology for live capture and reuse of project knowledge in construction
    Tan, Hai Chen
    Carrillo, Patricia M.
    Anumba, Chimay J.
    Bouchlaghem, Nasreddine
    Kamara, John M.
    Udeaja, Chika E.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (01) : 18 - 26
  • [32] Methodology for integrating Concurrent Engineering concepts in a steelwork construction project
    Anumba, CJ
    Baldwin, AN
    Bouchlaghem, D
    Prasad, B
    Cutting-Decelle, AF
    Dufau, J
    Mommessin, M
    [J]. ADVANCES IN CONCURRENT ENGINEERING: CE99, 1999, 99 : 479 - 488
  • [33] A methodology for enhancing the reliability of expert system applications in probabilistic risk assessment
    Yazdi, Mohammad
    Hafezi, Pendar
    Abbassi, Rouzbeh
    [J]. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2019, 58 : 51 - 59
  • [34] Analyzing the factors affecting construction project schedules amidst COVID-19 pandemic
    Adepu, Nikhitha
    Kermanshachi, Sharareh
    Pamidimukkala, Apurva
    Loganathan, Karthikeyan
    [J]. PROJECT LEADERSHIP AND SOCIETY, 2023, 4
  • [35] A Probabilistic-Based Method to Determine Optimum Size of Project Buffer in Construction Schedules
    Poshdar, M.
    Gonzalez, V. A.
    Raftery, G. M.
    Orozco, F.
    Romeo, J. S.
    Forcael, E.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
  • [36] Comprehensive control technique of reliability in large construction project management
    Lu, Ning
    Liao, Xiang-Hui
    Wang, Wei
    Feng, Juan
    Xiao, Yan
    [J]. Chongqing Jianzhu Daxue Xuebao/Journal of Chongqing Jianzhu University, 2007, 29 (02): : 132 - 134
  • [37] Improving the Accuracy of Project Schedules
    Lorko, Matej
    Servatka, Maros
    Zhang, Le
    [J]. PRODUCTION AND OPERATIONS MANAGEMENT, 2021, 30 (06) : 1633 - 1646
  • [38] Emerge of scaling in project schedules
    Vazquez, Alexei
    [J]. EUROPEAN PHYSICAL JOURNAL B, 2024, 97 (04):
  • [39] An Entropy-Based Upper Bound Methodology for Robust Predictive Multi-Mode RCPSP Schedules
    Chen, Angela Hsiang-Ling
    Liang, Yun-Chia
    Padilla, Jose David
    [J]. ENTROPY, 2014, 16 (09) : 5032 - 5067
  • [40] Identifying and Analysing the Root Causes of Quality Non-Conformance in Construction Project Baseline Schedules
    Srinath P.
    Varghese K.
    [J]. Journal of The Institution of Engineers (India): Series A, 2023, 104 (02) : 397 - 416