共 50 条
- [33] The instability of last-buffer-first-serve scheduling policy for capacitated re-entrant lines PROCEEDINGS OF THE 1998 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 1998, : 2780 - 2784
- [34] A simulation-based scheduling system and its implementation in a textile operation 2nd International Industrial Simulation Conference 2004, 2004, : 442 - 446
- [36] SIMULATION-BASED DEEP REINFORCEMENT LEARNING FOR MODULAR PRODUCTION SYSTEMS 2020 WINTER SIMULATION CONFERENCE (WSC), 2020, : 1596 - 1607
- [37] Modeling and simulation of re-entrant semiconductor wafer fabrication lines with PM using GSPN MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2469 - +
- [38] Modeling and Simulation of a Re-entrant Manufacturing System Using Colored Petri Nets 45TH ANNUAL SIMULATION SYMPOSIUM 2012 (ANSS 2012), 2012, 44 (02): : 1 - 8
- [39] Scheduling policies combining different buffer priority rules in each work center of re-entrant lines ISIM'2000: PROCEEDINGS OF THE FIFTH CHINA-JAPAN INTERNATIONAL SYMPOSIUM ON INDUSTRIAL MANAGEMENT, 2000, : 143 - 148